COPPER ALUMINUM TUBE WELDING MACHINE
USD $9,000 - $11,000 /Set
Min.Order:1 Set
COPPER ALUMINUM TUBE WELDING MACHINE
The copper aluminum tube welding machine is suitable for air conditioning, refrigerator etc refrigeration enterprise. Based on 20 years more experience, we develop “correcting force freely adjust” new type plug-in resistance welding machine.
Feature:
1, Adopt the air-powered vertical pressure or air-powered lever pressure system, work piece clamp steady which make welding tie-in nice, steady, less dregs.
2, Novel structure, special design, good rigidity. Adopt the high definition guidance institution, high staying quality, high speed welding, pressure steady.
3, Microcomputer constant pressure control system, twice section discharge, multi- group memory programs, precise control of the welding time and welding current, easy to adjust. Can control clamping, welding, upset, off in welding process.
4, High conduction magnetism silicon sheet steel, secondary whole structure, output current is high, energy-saving and protection environmental.
5, Water cooling transformer, water cooling controlled silicon, and water cooling electrode head what can improve the use life of equipment.
PARAMETERS:
Model | Diameter | Power | Adjust Level of Output Voltage | Air pressure |
TL-25KVA | Φ4~Φ8 | 380V/50Hz | 8 Level | 0.6~0.8MPa |
TL-50KVA | Φ8~Φ12 | |||
TL-75KVA | Φ10~Φ16 | |||
TL-100KVA | Φ17~Φ22 |
1-Packing: professional export wooden box
2-Shipping:LCL/FCL, we have professional shipping department coordinate with customers on orders
1-Customized accordingly
2-Professional after service department
3-Testing service
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc.
3. Q: What is the payment term?
A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, D/A, D/P etc.
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 40 days after receive down payment.
5. Q: What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.
6. Q: How to contact us?
A:Web:
Skype: wood-bobomachine
Cell:008613813647547
Tel/Fax:008651387630500