Gold mining equipment
USD $4,700 - $50,000 /Set
Min.Order:1 Set
Jining Bafang Mining Machinery Co., Ltd.
KHYD explosion proof electric rock drill/ Explosion proof electric rock rotary drill
High quality air leg pneumatic rock drill 7655/Portable rock drill
Hot Sale of Hydraulic Rock Splitter/High Quality Stone Splitter
High Quality 100M Hydraulic Water Well XY-100 Core Drilling Machine With The Best Price
200M Hydraulic Water Well XY-200 Core Drilling Machine With The Best Price
gold mining equipment
General flow for placer/alluvial/river gold processing
1.Gold wash plant>>>>>>>>>>2.Centrifugal Concentrator>>>>>>>>>>>3.Shaking table>>>>>>>>>>>>>>>4.Amalgamator>>>>>>>>>>>>5.Amalgam Separator>>>>>>>>>>6.Smelting Furnace
The river gold mining equipment is usually used at the primary separation period of placer gold mining so as to washing and screening the gold ore. The upper sizes out are always reckoned as unuseful materials. The bottom sizes which contain the gold are usually processed by centrifugal concentrator or gold sluice box continuously to upgrade the gold ore. The concentrates of centrifugal concentrator could be processed by shaking table which is used to separate the gold from other minerals.
Tech Data:
Model | BF-20 Gold mining washing plant |
Capacity(t/h) | 20 |
Drum dimension(mm) | 1500*600 |
Screen size(mm) | <3-10 |
Power(kw) | 11 |
Dimension(mm) | 3200*1000*1300 |
Weight(kg) | 1500 |
Component
Item | Specification | Material | Remark |
Dimension | 3.2m*1m*1.3m | National standard steel | With channel steel, Angle iron, iron plate welded together |
Hopper | 1m*1.5m*1.3m | National standard steel | Material into the hopper, evenly into the drum screen |
Separating screen | Length*Diameter 1.5m *0.6m | Iron plate punching |
|
Support |
| 8#Square steel composition |
|
Carriage Wheel | Diameter 40cm | rubber | 2pcs |
Gold chute | 2.5m*1m*0.3m | 3mmNational standard plate | Gold washing |
Gold rush grass |
|
| 2.5m² |
Power | 8Diesel engine |
|
|
Reduction drive | #120Reduction drive |
|
|
Valves, spray nozzle, etc |
|
| Work for equipment |
Capacity:20t/h |
We could do the capacity from 20ton/h to 300ton/h. supply both stationary and mobile type river gold mining equipment
Package
1.STANDARD EXPORT CONTACINER 20/40 GP
2.Steel support &iron sheet sea-worthy package.
3.Load:Export software scientifical loading work.
Shipping BY SEA FREIGHT