JZG34B DEADLINE ANCHOR
USD $2,000 - $4,000 /Set
Min.Order:1 Set
Dongying Kangyu Petroleum Engineering Technology Service Co., Ltd.
JZ34B Deadline Anchor
JZ34B Deadline Anchor is a mechanism that converts deadline pull of a drilling rig into liquid pressure.
It is one of the important components of weight indicating system, which can be used with JY248A sensor made by the company to work as the primary instrument, and then makes a weight indicating system together with weight indicator and recorder.
Technical Specifications
1. Maximum deadline pull: 340kN
2. Sensator: JY248A
3. Error of output pressure f deadline anchor: ±1%
4. Size: 1205mm×1095mm×400mm
5. Weight: 1000kg
6. Slickline diameter: Φ35mm,Φ32mm