32ton Small Capacity Mining Dump Truck MT50
USD $50,000 - $70,000 /Unit
Min.Order:1 Unit
Xuzhou Silkway Machinery & Equipment Co., Ltd.
XY-1A core rotary drilling rig for 100 meters with high quality
high quality KD-150 underground Boring drilling Rig for 150m
High quality XY-1A core rotary drilling rig for 100 meters for sale
high quality GK180 drilling rig for 180 meters deep for sale
high quality GK400 water well drilling rig for 400 meters deep for sale
SDLG Small Mining Truck MT50
Engine: WP10.340E32
Rated Power:336HP
Gross Weight: 50ton
Max. Rated Load 32ton
Parameters of MT50
1. Specifications
Item | Data | Item | Data |
Max. Design Weight(kg) | 50000 | Overall Dimension(mm) | 8775x2558x3520 |
Unladen/Laden Max.Speed(km/h) | 65/48 | Unladen/Laden Max.Gradeability(°) | 36/17 |
Bucket Capacity(m³) | 20.5 | Min.Turning Diameter(m) | ≤19 |
Curb Weight(kg) | 18000 |
|
|
2. Main Data
Item | Data | Item | Data |
Wheel Tread(mm) | 2021(Front Axle)1890(Rear Axle) | Wheelbase(mm) | 4000(Front-Middle)1400(Middle-Rear) |
Approaching Angle(°) | 24 | Departure Angle(°) | 37.5 |
Ground Clearance(mm) | ≥275 | Number of Axles | 3 |
3. Engine
Item | Data | Item | Data |
Make | WP10.340E32 | Number of Cylinder | 6 |
Type | Line, Direct Injection, Water-cooling, Inter-cooling | Bore/Stroke(mm) | 126x130 |
Rated Power(kW) | 247 | Min. Fuel Consumption(g/kW.h) | ≤198 |
Rated Speed(r/min) | 2200 | Max. Torque(N.m) | 1350 |
Emission load (ml) | 9726 | Emission Standard | Stage III GB17691-2005, GB3847-2005 |
4. Transmission System
Item | Data | ||
Clutch | Type | Single Plate, Dry, Hydraulic Distant Control | |
Diaphragm Spring Separation(mm) | 12-14 | ||
OD/ID of Friction Plate(mm) | 430/242 | ||
Max. Separation Force of Diaphragm Spring(N) | 8400 | ||
Leverage ratio of separation | 1.73 | ||
Gearbox 9JSD150A | Type | Axis-fixed | |
Speeds | Forward 9, Reverse 1 | ||
Speed Ratio/ Gear Ratio | 1st | 12.57 | |
2nd | 8.39 | ||
3rd | 6.15 | ||
4th | 4.59 | ||
5th | 3.40 | ||
6th | 2.47 | ||
7th | 1.81 | ||
8th | 1.35 | ||
9th | 1.00 | ||
R1 | 13.14 | ||
Front Axle | Steering Axle(non-drive axle) | Casting Axle Housing | |
Middle-Rear Axle | Main Reduction Ratio | 1.7 | |
Wheel Edge Reduction Ratio | 3.947 | ||
Total Reduction Ratio | 6.733 | ||
Wheel | Rim | 8.5-20 | |
Tyre | 12.00R20 | ||
Tyre Pressure(MPa) | 0.83 | ||
Brake System | Braking Pressure | 0.85 | |
Main Brake | Pneumatic,Foot-controlled,Two-Circuit | ||
Auxiliary Brake | Engine Exhaust Brake | ||
Parking Brake | Spring Parking Brake |
5. Steering System
Item | Data |
Type | Manual Steering, Hydraulic Power Assisted |
Max.Turning Angle | 45 |
Safety Valve | √ |
Steering Pump | Gear Pump:Displacement21ml/r, Flow Control:26L/min |
Steering Cylinder-Cylinder Diameter x Stem Diameter x Min.Installation Distance-Stroke(mm) | HSGL-50*30*250-465 |
Steering Gear | NT12590M1 |
Min.Turning Diameter(m) | 19 |
System Working Pressure(Mpa) | 17+1.5 |
6. Lifting System
Item | Data |
Type | Pneumatic Control |
Lifting Cylinder-First Section Effective Dia. x Sections x Total Distance(mm) | 4TG-E160x4280ZZ |
Work Pump | Gear Pump CB3-100R-B |
Pneumatic Control Valve | BKQF34-C |
Lifting Valve | 34BQK-E20L |
Limit Valve | XQF22-B |
Max.Working Pressure | 25Mpa |
Bucket Lifting Time(full load) | 19s |
Bucket Lowering Time(no-lade) | 20s |
Total Time | 39s |
7. Fill Capacity
Item | Data | Item | Data |
Fuel | 380L | Engine Oil | 24L |
Hydraulic Oil | 105L | Gearbox | 13.5L |
Axle(Main drive and hub reduction gear) | 24L(Middle)22L(Rear) | Brake Fluid | 1.5L |
|
| Anti-freezing Liquid | 30L |
We Have Original Spare Parts for Sale...
01 WHAT ARE OUR ADVANTAGES COMPARED WITH ?
u Competitive Price - As a professional construction machinery exporter, we have abundant resources for pre-sale, sale and sale service. We work as the leading dealers of various leading China construction machinery manufacturers/factories, and are treated with best dealership price every year. From numerous comparison and feedbacks from clients, our price is more competitive than manufacturer /factories.
u Quick Response- Our team is consisted of diligent and enterprising people, working to respond client inquiries and questions all the time. Most problem can be solved within 12 hours.
02 WHICH TERMS OF PAYMENT CAN WE ACCEPT ?
u On T/T term, 30% down payment should be paid in advance, and 70% balance should be paid within 5 days before departure goods from factory.
u On L/C term, a 100% irrevocable L/C at sight by our acceptable bank.
03 HOW LONG WILL OUR PRICE BE VALID ?
We are a tender and friendly supplier, never greedy on windfall profit. Basically, our price remain s stable through the year. We only adjust our price based on two situations:
u The rate of USD /RMB varies significantly according to the international currency exchange rates.
u Manufacturers/factories adjusted to the machine price, because of the increasing of labor cost and raw material cost.
04 WHAT LOGISTICS WAYS WE CAN WORK FOR SHIPMENT?
We can ship construction machinery by various transportation tools.
u For 90% of our shipment, we will go by sea, for other machinery, like truck crane, big bulldozer and road roller, either by RO/RO and Bulk shipment.
u For neighborhood countries of China, such as Russia, Mongolia, Kazakhstan, Uzbekistan, etc., we can ship construction machinery by road or railway.
u For light spare parts in urgent demand, we can ship it by international courier service, such as DHL, TNT, UPS, or Fedex.
05 HOW LONG IS OUR GUARANTEE TIME?
u 2000 working hours or one year from the date of B/L, which comes first.
u Engineers available to service machinery overseas.
Sales Service
u Being available online 24 hours a day.
u Responding to your e-mails at the first time.
u Providing the best choice according to the customer’s needs.
u Giving reception and organize visit of the factory, meeting, technical communication for the customers.
After-sales Service
u Warranty: Silkway grants our clients a twelve-month-period or 2000-hours warranty for any machine purchased from us. During the warranty period, the defective parts will be repaired or replaced free of charge. But it does not cover all those parts damaged due to interventions for presumed problems or non conforming verification.
u Installation&Maintenance: Silkway has the ability to provide you with overall installation of complicated machinery and equipment, such as, crawler crane, tower crane, construction hoist, etc. Helping you to carry out the normal operation of the machines immediately.
^_^ Need More Details? Please Contact Us...