Q235 Forming System For Shear Wall And Column Concrete Slab
Q235 Forming System For Shear Wall And Column Concrete Slab
Q235 Forming System For Shear Wall And Column Concrete Slab
Q235 Forming System For Shear Wall And Column Concrete Slab
Q235 Forming System For Shear Wall And Column Concrete Slab

Q235 Forming System For Shear Wall And Column Concrete Slab

USD $900 - $1200 /Ton

Min.Order:20 Tons

Supply Ability:
300 Ton / Tons per Month
Port:
XINGANG TIANJIN
Payment Terms:
T/T L/C
Delivery Detail:
45 days

Quick Details View All >

Brand Name:
XMWY
Place of Origin:
China
Model Number:
XM001
Material:
Steel

XING MIN WEI YE Architecture Equipment Limited Corporation

Business Type: Manufacturer
Qinghuangdao Hebei China
Main Products: scaffold ,wall formwork ,slab formwork ,shoring prop

Product Details

  1. XMWY CONSTRYCTION EQUIPMENT LTD CO

  2. wall formwork



2.Benefit for you
1). Saving labor and material

Due to the excellent performance of the material, under normal circumstances can reuse of 300 times, 
thereby significantly reducing the cost of single use, at the same time, has many times reuse can 
effectively and avoid the template repeatedly procurement and transportation to bring additional time 
and cost, but also accelerate the construction progress.Template using modular assembly, handle 
connection, reducing the overall nails,wire, wood, flute and so on auxiliary use cost, and wood processing, equipment leasing costs.


2). Flexible construction
 
For column mode, the design of the different types, can be adjusted arbitrarily according to the size of 
column, basic coverage column die size required, and all column form innovation design of pulling out of hole, the die pillar reinforcement than traditional template reinforcement more simple.
Convenient pouring. On the wall, in one column, pouring, can also be a separate column, wall, floor slab 
casting.


3). Safety and environmental protection

The use of composite,reduce the discharge of construction garbage, at the same time, the template is damaged, to repair the hole; after the abolition of the template, recycling utilization, increases the mould of the residual value, thereby reducing the environmental pollution and reduce the negative impact on the environment.
 
3.FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.
 
 
4.customers visit


All in all meet customers demand in short time and provide good service for customers.
1.Provide good service and help to find the question when customers are in trouble, solve the problem as soon as i know.
2.Precise calculate drawings depends on CAD to save money. make a plan for you and let you know how to save money and let customers feel comfortable the process they plan to purchase.
3.make a quotation for customers
4.Reception customers see factory


5.Advantage:
Design and production, processing, assembly and synthesis, on-demand delivery, delivery on time and according to quality, quality inspection, inspection planning, customer service crisis coping ability and complaint handling ability, the ability of information processing, processing or customs logistics ability and so on.

ntact me
Chloe Teng               xmwyformwork(@)
Iternational Trade Dept. whatsapp:8615603394723 skype:xmwyzhy
Changli XingMinWeiYe Architecture Equipment Limited Corporation


Contact Supplier

Ms. Chloe manager Chat Now
Telephone
86-0335-2208895
Mobile
86-15603394723
Skype
xmwyzhy
Address
changli county Qinghuangdao,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Metal Building Materials
Categories
Hi~