Gold recovery wet pan, gold pan wet grinding mill machine, china wet pan mill
USD $3,800 - $4,000 /Set
Min.Order:5 Sets
Zhengzhou Huahong Machinery Equipment Co., Ltd.
HUAHONG new model wet pan mill for gold,silver,copper,lead,zinc ore with use and maintance methods
Hot selling in Egypt wet pan mill for gold, Double Wheel Dressing Gold Grinding Machine
CIQ wet pan mill Double Wheel Dressing Gold Grinding Machine from China
HUAHONG 2016 new wet pan mill for gold,silver,copper,lead,zinc ore with use and maintance methods
Wet pan mill/Gold grinding machine is the best equipment to replace ball mill. because it have small investment, high output, low production cost, good efficiency and easy installation. And the machine is the ideal beneficiation equipment for small and medium-sized enterprise. Gold grinding machine is mainly used to process the gold, silver, lead, zinc, iron, molybdenum, copper, antimony. The wet pan mill is named by the diameter of roller. Φ1300,Φ 1350,Φ 1400,Φ 1500,Φ 1600 is suitable for selection of iron ore, molybdenum ore ,lead ore ,zinc ore, antimony ore and so on. Φ 850, Φ 900, Φ 1000,Φ 1100,Φ 1200 is suitable for selection of gold ore. Above all, 1200a type is the most popular and widely use.
1. The raw materials shouldn’t begin to be put into the machine before the gold selecting wet pan mill running normally.
2. The raw materials are not allowed to be left in the machine. Suppose the machine is stopped while during operation, the residual materials should be cleared immediately, and then the gold selecting wet pan mill can be started again.
3. The raw materials should be put into the machine uniformly. It's better to use feeding equipments together with gold selecting wet pan mills.
4. The bearing part should be applied with butter regularly.
5. Every bolt should be checked regularly to avoid flexibility.
6. The bearing should be changed in time if it is damaged to avoid ruining other parts.
7. While the machine is running, if there were abnormal noise, or the temperature was too high, or the motor current was too high, or other unappreciated cases, the gold selecting wet pan mill should be stopped immediately.
8. The V-belt should be removed while examining and repairing the machine for your safety.
1.When inputting gold sand into the rolling drum, the rollers compress the sand over and over into tiny particles.
2.Please put in 5 kg mercury at first, the mercury can absorb the gold or other metals.
3.At last, use a high-density red cloth to wrap mercury up.
4.Then squeeze it, the mercury will be pressed out and pure gold stayed.
5.As to the large capacity, we can use mercury shaking machine and mercury steamer to replace the manual work. ook.
91.8% Response Rate
91.8% Response Rate
91.8% Response Rate
Zhengzhou Huahong Machinery to be the leading enterprise which is professional manufacture double roller crusher,grading crusher, double teeth roller crusher ,our double roller crusher with new design.We provide variety of double roller crusher with high processing capacity, featured structure. As a specialized manufacurer and exporter in china, Zhengzhou Huahong striving its best to service our customer.Our machines are all through ISO CE SGS certificate.