Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

USD $1 - $50,000 /Set

Min.Order:1 Set

Supply Ability:
50 Set / Sets per Month
Port:
tianjin shanghai qingdao
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Type:
Other, gold grinding machine
Motor Type:
AC Motor
Power(W):
7.5kw -55kw
Capacity(t/h):
depend on the model
Place of Origin:
Henan, China

Zhengzhou Huahong Machinery Equipment Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer,Trading Company
Zhengzhou Henan China
Main Products: Crusher ,Wet Pan Mill ,Ball Mill ,Dryer ,Vibrating Screen ,Sand Making Machine ,Mine Washing Machine ,Flotation Machine ,Raymond Mill

Product Details

 

 

Gold grinding machine is mainly though raw material repeated mixing, rolling, crushing and rolling to reach equilibrium moisture, uniform ratio, low air content, so as to improve the molding rate and molding quality. The final grinded products are with high density, good strength, high percentage of non porosity. This machine mainly used for choosing gold, silver, lead, zinc, iron, molybdenum, copper, antimony mine, The ores that ball mill can be choosen, the gold grinding machine can be used.

 

Application of wet pan mill:

 

1.This gold refinding machine is widely used to separate gold, molybdenum, silver, copper, lead, iron, zinc, etc.

 

2.The machine is an ideal equipment for middle or small gold sand refinery.

 

The Working Principle of  Gold grinding machine:

 

1.Firstly the motor will transmit the motive power to reduction gears,under the drive of reduction gears that passing through large vertical spindle,then the power cabient transfers to above whippletree.

 

 

 

2.The whippletree pulls the two runner wheels clcokwise rotation,runner wheels are not only revoluting around the large vertical spindle but also could retating by themselves.

 

 

 

3.After adding into ore,the materials are under the extrusion of grinding roller weight to revoluting and rotating with runner wheels,when twisting that coming into being huge friction force with grinding base,after suffering repeated extrusion,rub,grinding that be crushed thoroughly.

 

 

 

4.Under the effection of grinding roller operating,the crushed materials and the water mixed intensively to float on it uniformly, then passing through the overflow discharge gate that setting up on the mill basin to discharge,after that enter into next operation procedure to process. 

 

 

 

5.Coarse mineral was sank on the bottom of grinding base,goning on grinding and crushing,till the fineness could reach to standard floating on it.

 

 

Gold method for grinding machine:

 

The first step: after the installation and commission of gold grinding machine, then putting 1 kg mercury into the bottom, then the machine begin to work. 

 

The second step: every time collecting one time gold sand, when change , adding 5kg mercury into the bottom in order to collect gold sand and mercury of bottom, the place the mercury into the equipment which for collecting gold, then using a relatively high density of red cloth to wring mercury out, and open the red cloth the rest is gold sand

 

in the shift join five kilos of mercury charge roller, the bottom of the sands and mercury, the mercury receive into gold equipment, used a relatively high density of red cloth to mercury forced wring it out, and then open the red cloth which left is the golden sand.

 

 Installation of grinding machine:

The first step: building a foundation about 4 m² with concrete, and making it leveling ,then put 4 square timber on the horizon.

The second step: putting gold machine rack on the timbers, the water lifting on gold grinding machine, fixed them with screw stabilization.

The third step: putting sand with 4cm thickess into the basin, making sand leveling.  Then place the Nianpan (also called roller bottom runway) above the sand in the tub. Nianpan must be placed in the central of basin, which prevents the roller to deviate the track.

The fourth step: the usage and blue in the middle of the two roller core is arranged in the grinding roller disc fixed, and then 2.5 cm thick wood (top to oblique) the core ring and a grinding roll in the middle of infill, prevent grind roll in running away. Then the two installed grinding roller lifting in the roller, the bottom of the groove, the short straight bar sleeve in rolled gold machine of the intermediate shaft, and a grinding roller of the roller core connection, and then the long pull bar sleeve into the top of shaft and hook hanging pull bar at both ends of the hole and below and the roller core connection can be. Convenient 

and quick.

The use and maintenance ways of wet pan mill:

1, after the machine works normally, starting feeding.

2, this machine is prohibited to work with material, if the machine stop , you must first clean the residual ore in the middle of mill groove and start again.

3, feeding should be uniform, not suddenly more and less, it is best to use the feeding machine.

4, bearing parts often needs to add butter, reducer must be constantly check whether the loss of gear oil.

5, often check the screws are loose or not

6, If you found that the bearing damage, must replace it in time, so as to avoid damage to other parts of shaft eccentricity

7when gold grinding machine operate, people should note that reducer or bearing parts have  abnormal sound, the temperature is too high, the motor current is too large, if the above phenomenon, people should immediately stop out.

8, when overhaul the machine,  ensure the safety, people must remove the motor belt.

 

The  main parameters Gold grinding machine

Model

Specification

Input size

Speed(R/min)

Motor Power

Weight(t)

1600A

1600×400×200×500±20mm

30mm

20-22

25KW

14.5

1500A

1500×350×200×460±20mm

20-22

22KW

13.5

1500B

1500×350×150×460±20mm

20-22

22KW

12.3

1500C

1500×300×150×420±20mm

20-22

22KW

11.3

1400A

1400×250×150×350±20mm

16-18

Y18.5kw

8.5

1400B

1400×250×150×350±20mm

21-23

18.5kw

8.5

1350A

1350×250×150×350±20mm

16-18

18.5kw

8

1350B

1350×250×150×350±20mm

21-23

18.5kw

8

1300A

1300×250×150×350±20mm

16-18

15kw

7.5

1300B

1300×250×150×350±20mm

21-23

15kw

7.5

1200A

1200×200×80×250±20mm

17-19

7.5kw

5.5

1200B

1200×200×80×250±20mm

23-25

7.5kw

5.5

1100A

1100×200×80×250±20mm

17-19

7.5kw

5

1100B

1100×200×80×250±20mm

23-25

7.5kw

 4.5

 Srandard English parameter:

Model

Input size

Speed(R/min)

Motor Power

Weight(t)

64''

1.2''

20-22

25KW

14.5

60''

20-22

22KW

11.3

56''

21-23

18.5kw

8.5

54''

16-18

18.5kw

8

52''

21-23

15kw

7.5

48''

17-19

7.5kw

5.5

44''

23-25

7.5kw

 4.5

 

Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Spare parts of wet pan mill:
Wet Pan Gold Mill / gold selecing machine with long using time and little energy costWet Pan Gold Mill / gold selecing machine with long using time and little energy costWet Pan Gold Mill / gold selecing machine with long using time and little energy costWet Pan Gold Mill / gold selecing machine with long using time and little energy costWet Pan Gold Mill / gold selecing machine with long using time and little energy costWet Pan Gold Mill / gold selecing machine with long using time and little energy cost
 
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost
Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

Clients visit our factory :

 

 

Our product delivery to foreign country 

 

 

 

Our Services

 

Pre-sales service:

Be a good consultant and assistant to customers, to ensure our customer's investment rewarded 

with great profit.
1.Enough details about the ores or slags shall be learned, sometimes a test is needed for some ores.
2. Equipment of right model is selected for customers.
3. Customized products and processing flow sheet can be designed and developed to meet 

customer's special needs,  
4. Engineer could be sent to observe customer's working site to come up with an optimized solution 

accordingly.

 

On-sales service:
Every customer is respected and convenience and reliability will be provided. We are devoted to 

helping you to benefit as much as possible.
1. Inspection is a must before delivering of the goods.
2. Assistance to make a construction plan by supplying all drawings and data needed.
3. Most favorable scheme for you with the guaranteed quality.
4. Timely communication to make sure improvement of project and your requirement met.

 

After-sales service:
1. Installation, adjustment, and testing of equipment is available.
2. Train of technicians and workers at site is promised.
3. Service engineers will not leave until ensuring the whole line running well after the installation & 

adjustment is finished.
4.If any failure or question about the machines or the processing line, contact us and we are available 

at any time.

Company Information

     Zhengzhou Huahong Machinery & Equipment (Group) Co., Ltd. is located in National Hi-Tech Industrial Development Zone of Zhengzhou City, Henan Province, Our products passed the ISO9001 international quality system certification. It has won the glory of provincial superior enterprise. Huahong company's quality of products have been in a leading and dominant position in machinery industry of China. Its high-quality products and first-class  services were also have been praised by overseas and domestic customers.  

Certificate:

 

 Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

 Wet Pan Gold Mill / gold selecing machine with long using time and little energy cost

If you are interested in our product, please contact me!

Contact Supplier

Mr. hong hua Manager Chat Now
Telephone
0086-371-67898087
Mobile
13676999289
Fax
0086-371-67816206
Address
at the Crossing chemical Road and Changchun Road zhongyuan district Zhengzhou city Henan province China Zhengzhou,Henan

You May Like

New Products

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mine Mill
Categories
Hi~