special price bogie side bearer for Ukrainian Railway
USD $2,000 - $3,000 /Set
Min.Order:30 Sets
Luoyang Mingyang Engineering Machinery Co., Ltd.
1.Got the American "AAR" Certification;
2.Got the Russian Certification;
3.Got the Ukrainen Certification;
4.Using the German "V" modeling technology;
Side frame - one of the main structural elements of the bogie framework of the model 18-100. It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.100.00.002-4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels 20GFL and 20GL.
Bolster drawing No.100.00.001-6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel 20GFL or 20GL.One of the main frame details of a bogies framework model No.18-100. Set lifetime of a bogie frame before a bolster discarding is 30 years. The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years.
Overall dimension:
side frame:2.41m*680cm*56cm weight:400kg
bolster:2.61m*39.5cm*47cm weight:525kg