High Output Fully-automatic Chain Link Fence Machine
USD $12,000 - $23,000 /Set
Min.Order:1 Set
Hebei HTK Welding Equipment Manufacture Co., Ltd.
New Products for High Speed Chainlink Fence Machine/Diamond Mesh Machine
golf course fence mesh chain link fence machine production line
2-4meter Fully-automatic chain link fence machine (Direct Factory)
Guarantee period One year chain link fence equipment manufacturer
chain link fence machine/wire mesh fence weaving machine maufacturer and provider
Full Automatic galvanized/PVC coated chain link fence Machine
High Speed Fully-automatic Chain Link Fence Machine
I.Technical Description
Chain link machine for manufacturing chain link fences of different sizes. The wire is taken in from the payoff stand and passed through the dies where the DIAMOND SIZE takes place. Different gap sizes. After passing from the die the diamond pattern wire is automatically thrown on the winding shaft in the stitching process. Once the stitching is complete the woven is manually glided down to enable the next stitch to take place.
The chain link is automatically wound to form rolls when the desired length is manufactured.
The machine is controlled by PLC automatic controller, so only one person is needed to operate it.
Use compacting machine to make it into rolls.
It has two typs of fence machine.
Double wire chain link fence machine
Single wire chain link fence machine.
(Bending chain link fence machine, Twisting chain link fence machine)
II.Technical Parameters
Product Name | Chain Link Fence Machine |
Systerm Control | PLC Systerm Control |
Wire Diameter(mm) | 1.8-4.0mm Feeding Wire numbers:two |
Mesh Size(mm) | 25x25-100x100 |
Netting width(mm) | 1000-4000 |
Capacity(m2/hour) | 100-120 (m2/hour) |
Rated Voltage | 380V-3P-50HZ, can be made as your requirement |
Motor Power | 9.0kw |
Weight (T) | 4.2 |
Outside Size | 6600*1430* 1600mm, 5100*1500* 1250mm |
Accessories | Operation tools 1 set Operation manual 1PCS |
Guarantee Period | One Year |
MOQ | 1Set |
Capacity | 5 sets per month |
Port | Tianjin, Qingdao, Shanghai, etc |
Delivery Time | 7 days(stock goods), 20days after received the deposit |
Packaging | Plastic films and wooden pallet, cabinet packed by wooden box |
Pre-sales Service
1.Reply you enquiry in 24 hours working hours
2.Experienced staffs answer all your questions about the machine
3.Exclusive and unique solution can be provided to our customer by your well-trained and professional engineer.
After-sales Service
1.Maintenance period: one year
If the buyers need, we can send our technical staff to the buyers’ place to debug the machine and providing the training in 20 days after the machines arrive at the destination port.
2.The debugging fees: free
3.The training fees: USD80-100/day for each technical
4.The numbers of technical persons: most often one technical person per net machine
5.The fees ,such as round-trip tickets, accomodation etc, are all in buyers’ account. During the maintenance period:the parts damaged non-artificially will be provided free of charge. If you need the technicians, we will assign the expertised staff to your company. And the fees, such as round-trip tickets, accomodation etc, are all in your account. 6.After the maintenance period: If you need the machine parts,we will provide it as our cost.
Hebei HTK Welding Equipment Manufacture Co., Ltd
Formerly Known as Shenzhou City Chaoyi Wire Mesh Equipment Co.,Ltd
Business Type: Direct Factory , Manufacturer
Location: Shezhou,Hebei, China(Mainland)
Year Established: 2005
We have 2 senior engineers,10 senior technicians,more than 100 employees
1.> Products: welded wire mesh machine, Chain link fence machine, field fence machine
2.> Supply ability: we have the complete accessories, 10 sets per month.
3.> Warehouse: We have many spot goods to ensure the needs of customers
4.> Main Market: Algeria, India, Thailand, Burma, South Africa, South Asia, Egypt, etc
Q: Does your company is a factory or trading company?
A.We have two factory ourself for chain link fence machine. and we are on business more than 10 years.
Q: What's the producing time and delivery time?
A.If we have stock, delivery to Tianjin port about 5 days, No stock, it wil be 20-30days after received your deposit.
Q: What's the departure port?
A.Usually Tianjin Port, Guangzhou, Qingdao, Shanghai and other ports in China.
Q: what's the packing of the machine?
A.In wooden pallet, In plastic film, the spare parts and cabinet packed by wooden box.
Q: What's the payment term?
A.Usually by T/T( 30% in Advance), L/C at sight.
Q: Can I change the motor as my local voltage?
A.We can change the voltage as your requirement, and there's no extra charge.
Q: Can you OEM( use my logo and color)?
A.We can OEM with your logo and color design.
Q: Does machine have guarantee period?
A. the guarantee period is one year. it is free to change the part.
Q: How do your control quality?
A.We have an inspection team to check the products at all stages of the manufacturing process-raw material, woven fence process or test finished products, etc. 100% inspection in assembly line to achieve the required quality levels.