2016 square LED lights cover/led panel/LED parts
USD $0.55 - $0.65 /Piece
Min.Order:4000 Pieces
Xiamen Leadtop Electric Appliance Co., Ltd.
2016 plastic wall-handing storage holder for pen/ label card used in goods shelf
Item | 2016 square LED lights cover/led panel/LED parts |
Material | PC |
size | 100*100,80*80mm |
service | OEM/ODM |
Characters | 1.easy processing
3.Higher toughness
4.anti-yellowing
5.durable |
the related products:
1.carton packaging after PE bag
2.shipping by car/truck/cargo ship/Fedex/DHL/TNT
1. Machine made plastic LED cover, perfect for home/hotel/restaurant/party/industrial use.
2. Special design and accurate quality control make sure every plastic products offered is as perfect as possible.
3. Your own design is welcomed, pattern, size and color etc. could be done on the plastic injection procuct according to your drawings.
4. Standard export packing assure safe delivery and intact shippment of the water glass to your site.
5. Timely delivery, 2000 square meter self-own warehouse holding large stock enable our supply.
6. Competitive price offered.
7. All terms are negotiable. We are always for you.
Contact Us
Q1: How soon can I get the quotation?
•A: Within 24 hours after receiving your design or drawing.
Q2: Do you make customized products based on our design drawings?
•A: Yes, we are a professional mould factory with an experienced engineering team making custom products according to clients’ drawings. We use Solidwork, AutoCAD, and Pro-Engineer software.
Q3: I have no 3D drawing, how should I start the project?
•A: You can supply us a sample, we will help to finish the 3D drawing design.
Q4: What is your MOQ?
•A: Usually our MOQ is 1000~3000 according to models, but the more, the cheaper. Besides, we are happy to make prototype or sample for clients to ensure quality standard.
Q5: How much is your sample fee? Is it refundable?
•A: Usually sample fee is three times of batch unit price and it will be returned during mass production.
Q6: How long is your lead time?
•A: It depends on the quantity and difficulty of products. Usually our turnover time is 20-30 days (mass production)
Q7: How will you control the quality?
•A: We have quality control department, which will set up control plan before stating the project, all PPAP report will be provided along the whole process.