Carbon Black Masterbatch Air Cooling Pelletizing Line/Tse Series Filler Masterbatch Machine Pelletizing Line
USD $38,000 - $50,000 /Set
Min.Order:1 Set
Nanjing Haisi Extrusion Equipment Co., Ltd.
GOOD NEWS 1: Buy extruder within 30 days, we will send a pair more twin screw for free !
GOOD NEWS 2: Watching youtube video and leave feedback,you can get 200 USD discount !
Working video on Youtube: https://youtu.be/OPWkUFRM-js
1.Do you know about Filler Masterbatch?
Calcium carbonate filler masterbatch is made with super fine calcium carbonate and other high quality special additives based in LLDPE carrier.
CaCO3 filler masterbatch not only cuts down production costs by replacing a part of virgin polymer during extrusion, injection and blow molding progressing but also increases output, improves production conditions as well as a number of physical and chemical properties of finished products.
2.Applications:
Transparent Filler Masterbatch | |
Applications: Blowing film, blow molding, injection molding, extrusion Non-woven fabric PP woven bag, jumbo bag Construction materials Pipe extrusion Plastic footwear, housewares | |
PE Filler Masterbatch | |
Applications:
Blowing film, blow molding, injection molding, extrusion | |
HDPE Filler Masterbatch | |
Applications:
Blow Molding ( HDPE pipes, bottles, cans, containers) | |
PP Filler Masterbatch | |
Applications:
Blowing film, blow molding, injection molding, extrusion | |
HIPS Filler Masterbatch | |
Applications:
Extrusion: HIPS shaped sheets |
3.Extruder figure:
Mode | Diameter | L/D | Screw rotary speed | Motor power(kw) | Torque(N.M) | Capacity(kg/h) |
TSE-20 | 22 | 32-44 | 600 | 5.5 | 43 | 1-10 |
TSE-30A | 31 | 32-48 | 500 | 11 | 105 | 5-30 |
TSE-30B | 31 | 32-48 | 600 | 15 | 119 | 5-40 |
TSE-40A | 41 | 32-52 | 600 | 15 | 119 | 65-110 |
TSE-40B | 41 | 32-52 | 400 | 22 | 263 | 90-150 |
TSE-52B | 51.5 | 32-64 | 600 | 75 | 597 | 225-250 |
TSE-65B | 62.4 | 32-64 | 600 | 90 | 716 | 250-300 |
TSE-75B | 71 | 32-64 | 600 | 132 | 1050 | 350-550 |
TSE-75D | 71 | 32-64 | 600 | 220-250 | 1990 | 500-1000 |
TSE-95A | 93 | 32-64 | 500 | 250 | 2387 | 600-1000 |
TSE-95B | 93 | 32-64 | 600 | 315 | 2506 | 800-1200 |
TSE-135 | 133 | 32-64 | 500 | 750 | 7162 | 1500-2250 |
1.Our Factory
2.Our Suppliers
1.Before Service
-Introduce produces in detail
-Recommend suitable solutions
-Offer test
2.During Manufacturing
-Provide engineering conditions
-Inform project proccssing status
-Insure the product designed in accordance with technical document
3.After-sale
-Provide installation commissioning and training
-Offer sapre parts
-Provide neccssary technical support and update information
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.