Low price Expanded Wall Plaster Metal
USD $3 - $25 /Square Meter
Min.Order:1 Square Meter
Anping County Jingzhi Wire Mesh Products Co., Ltd.
Low price Expanded Wall Plaster Metal
Air Gong
Skype:microcosm-smile
Material: Stainless steel plate, low-carbon steel plate, aluminum plate, copper plate, iron plate, nickel plate and titanium plate
Characteristics
Specification:
Sheet thickness (mm) | Opening in with (mm) | Opening in length (mm) | step | Roll width (m) | Roll length (m) | Weight (kg/sqm) |
0.5 | 2.5 | 4.5 | 0.5 | 0.5 | 1 | 1.8 |
0.5 | 10 | 25 | 0.5 | 0.6 | 2 | 0.73 |
0.6 | 10 | 25 | 1 | 0.6 | 2 | 1 |
0.8 | 10 | 25 | 1 | 0.6 | 2 | 1.25 |
1 | 10 | 25 | 1.1 | 0.6 | 2 | 1.77 |
1 | 15 | 40 | 1.5 | 2 | 4 | 1.85 |
1.2 | 10 | 25 | 1.1 | 2 | 4 | 2.21 |
1.2 | 15 | 40 | 1.5 | 2 | 4 | 2.3 |
1.5 | 15 | 40 | 1.5 | 1.8 | 4 | 2.77 |
1.5 | 23 | 60 | 2.6 | 2 | 3.6 | 2.77 |
2 | 18 | 50 | 2.1 | 2 | 4 | 3.69 |
2 | 22 | 60 | 2.6 | 2 | 4 | 3.69 |
3 | 40 | 80 | 3.8 | 2 | 4 | 5.00 |
4 | 50 | 100 | 4 | 2 | 2.7 | 11.15 |
4.5 | 50 | 100 | 5 | 2 | 2.6 | 11.15 |
5 | 50 | 100 | 5 | 2 | 2.5 | 12.39 |
Surface treatment: Sprayed plastics, hot galvanization, electrogalvanization, anti-rust paint, etc.
Purpose: Widely used for construction of roads, railways, civilian buildings, water conservancy, etc., protection of various machines, electric appliances, guards of high-grade sound boxes and windows and protection of aquatic farming
Details
Application
Mainly used in filter elements medicine,paper making,filtering,breeding,wire mesh for battery,wire mend for satellite aerial,machine protecting,handicraft making and window screen substitute.
Free sample.
Company information
Anping County Jingzhi Wire Mesh Products Co., Ltd. promise: abide by the contract, reasonable prices, and to ensure that the products sold directly to customers, never appeared deficit meters phenomenon, fair trade, the spirit of "people-oriented, quality for survival," the purpose, the "fine texture" brand bigger and stronger. Welcome customers to visit and guide, expand cooperation, mutual benefit and common development.
picturers of factory
1: Shipment: 30days after receive your 30% T/T advance payment.
2: Payment: 30% T/T in advance, the balance by T/T against fax copy of B/L.
Air Gong
Skype:microcosm-smile