Large Space Prefabricated Steel Warehouse
Large Space Prefabricated Steel Warehouse
Large Space Prefabricated Steel Warehouse
Large Space Prefabricated Steel Warehouse
Large Space Prefabricated Steel Warehouse
Large Space Prefabricated Steel Warehouse

Large Space Prefabricated Steel Warehouse

USD $40 - $50 /Square Meter

Min.Order:500 Square Meters

Supply Ability:
1500 Square Meter / Square Meters per Month
Port:
Qingdao port
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
dfx
Model Number:
steel structure
Material:
Other, Steel, Steel Q235 Q345
Use:
Warehouse, Other, Warehouse, Workshop,Plant

Qingdao Director Steel Structure Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Steel StructureH/C/Z Section Steel ,Corrugated Steel Sheet ,Sandwich Panel ,Poultry House

Product Details

Large Space Prefabricated Steel Warehouse

Product Description

Specifications:

Main steel frameH section steel beam and columns, painted or galvanized, galvanized c section or steel pipe
Secondary frameHot dip galvanized c purlin , steel bracing , tie bar , knee brace , edge cover etc.
Roof and wall panelcorrugated steel sheet or sandwich panel (EPS,Rockwool,Fibre glass,PU)
BraceAngle,tube and round bar;painted or galvanized
Knee braceAngle steel
Door Sliding sandwich panel door or roller metal door
WindowPVC/aluminum alloy window
Gutter Steel material
Rain pipePVC Pipe
Edge cover 0.5mm thickness color steel sheet 
ConnectingPost feet bolts, intensive bolt
Crane5MT, 10MT, 15MT, etc
DrawingWe could make designs according to your requirement

 

Advantages of light steel structure:
1) Cost saving and transportation convenient, custom design available.
2) The main beam and column are made of quality steel.
3) Steel structure makes the house resist heavy wind of 140km/h and 8-grade earthquake.
4) Easy assembly and disassembly several times without damage.
5) Widely used in construction site, office building, dormitory etc.
6) Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced.

 

Drawings & Quotation:
1) Customized design is welcomed.As long as you like, we can design and provide drawings for you.
2) In order to give you an exactly quotation and drawings, please let us know the blow information:

  1. Dimension: Length, width, height, eave height, roof pitch, etc.

  2. Doors and windows: Dimension, quantity, position to put them.

  3. Local climate: Wind speed, snow load, floor load etc.

  4. Wall and roof material: Sandwich panel or steel sheet.

  5. Crane beam: Do you need crane beam inside the steel structure? And its capacity.

  6. Other requirements.


Engineering Design Software:
AutoCAD, PKPM, MTS, 3D3S, Tarch,Tekla Structures(Xsteel)V12.0.etc.


Payment Terms:
1) Payment: L/C or by T/T(50% T/T in advance, the balance before shipment)
2) Delivery time: 15~40 days, usually as customers' order.
3) Shipment: 20”GP, 40”GP, 40”HQ, 40”OT or in bulk.

 

Related Products

Large Space Prefabricated Steel Warehouse

Large Space Prefabricated Steel Warehouse

 

Workshop

Large Space Prefabricated Steel Warehouse 

Packaging & Shipping

 

Large Space Prefabricated Steel Warehouse 

FAQ

1.Common type of the industrial building?

Reply:Portal frame is the usual type in the industrial workshop and warehouse shed.Other types also could be designed and manufacturer as per clients'  request.

2.What’s the quality grade of the steel structure components?

Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure.

3.How about the delivery time?

Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabrication quantity.

4.How about the derust grade?

Reply:Ball blasting Sa2.5 on main steel structure manual derust St2.0 on secondary steel structure.

5.What kind panel used for the roof and wall?

Reply: Color corrugated steel sheet and sandwich panel could be used.Sandwich panel

performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool and PU.

6.How to install it?

Reply: We will furnish you the detailed construction drawing and the construction 

manual which could help you to erect and install the building step by step.We also could send the engineer your local to help you if needed.

7.Maintenance:

Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.So the surface will stay m ore time.

Contact Us

Company Name:Director Co.,Ltd

Qingdao Director Steel Structure Co.,Ltd

Add:Room 1102, Unit A, No.1 Building, Haili Plaza, No. 917, Tongan Road, Qingdao, China

Web: ;  

Contact Person:Alison Zhang

Tel: 0086-532-66716752  

Fax: 0086-532-66710826Large Space Prefabricated Steel Warehouse

E-mail: info(at)

Whatsapp & cell: 0086-13280803375

Skype: Alison.zhang99

 

Pls kindly scan Quick Response (QR) code(our website),you could get more information by cellphone.

Contact Supplier

Telephone
86-532-66710825
Mobile
13969627763
Fax
86-532-66710826
Address
Room 502, Unit 1, No. 7, Longyan Road, Shinan District, Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Prefab Houses
Categories
Hi~