Lower Rubber Control Arm Bushing For Audi 4F0407183E
USD $0.1 - $10 /Piece
Min.Order:500 Pieces
Nanchang Ganjiang Bush Factory
Lower Rubber Control Arm Bushing For Audi
Main Informations:
Name | Value |
Location | Front Axle |
Note | Lower |
Inner Diameter | 65.5mm |
Outer Diameter | 12.3mm |
Height | 80mm |
Mold | Year |
AUDI A4 (8EC, B7) | 2004/11 - 2008/06 |
AUDI A4 Avant (8ED, B7) | 2004/11 - 2008/06 |
AUDI A4 Convertible (8H7, B6, 8HE, B7) | 2002/04 - 2009/03 |
AUDI A6 (4F2, C6) | 2004/05 - 2011/03 |
AUDI A6 Allroad (4FH, C6) | 2006/05 - |
AUDI A6 Avant (4F5, C6) | 2005/03 - 2011/08 |
AUDI (FAW) A6L Saloon (C6) | 2005/03 - |
Details Of Rubber Parts For Your Reference As Below:
Rubber Material | EPDM, SBR, NBR, CR, NR | according to your requirement |
---|---|---|
Metal Material | DIN, ASTM, JIS, BS, NF, GB | according to your requirement |
Characteristic | Ozone resistant,High / Low temperature resistant / Aging resistant / Oil resistant / Insulation / Electric conduction / Elasticity / High tensile strength | according to your requirement |
Rubber Hardness | 50A-90A | according to your requirement |
Surface treatment | parkerising,Polishing,galvanized, electroplating, spraying, and painting and zinc plated and so on | according to your requirement |
Certification | ISO/TS16949:2009 | OEM Grade |
Tolerance | Ø&L Min 0.02mm | according to your requirement |
Packing | Carton box / PP bag | according to your requirement |
MOQ | 500 pieces | |
Delivery Time | Sample: 7days Mass:15-45days | According to your quantity |
Remarking
|
Delivery Time:
Sample Time:
We provide free samples for parts in stock. Client pays for air freight for sample delivery or provide freight account on collect.
Sample can be sent out next day upon request.
Please send email for sample requirement.
Bulk Order Delivery Time:
Stock in hand: Ship next day after receipt of payment.
Bulk production: 30~45 days after receipt of deposit (may vary depending on specific items and item quantities)
For urgent order, we can make it faster. Please send email to negotiate.
Payment Terms:
We usually accept T/T,L/C at sight,Western Union.
Packing Method:
1.Neutral packing (neutral plastic bag+ neutral carton+ Plywood/Iron pallets)
2.Custom packing (with logo or barcode according to clients’ requirement)
Our Advantage:
1.All the control arm bodies are made by OEM grade forging, with high strength and torque;
2.All the OEM grade bushings and CR duct cover are made by our own factory.
Product Line: