qualified aluminum frame for door and window
USD $2,500 - $3,500 /Ton
Min.Order:1 Ton
qualified aluminum frame for door and window
Procedure:
drawing---->mould confirmation---->sample confirmation---->batch order---->delivery
Material | 1,2,3,5,6,7,8 series | |||||||||||||||||||||||||||||||||
Temper | O, F, H14, H34, H32, H112, T4, T6 | |||||||||||||||||||||||||||||||||
Surface treatment | Mill Finish,Anodized,Eletropharesis,Powder Coated, Wooden Finish, Polish | |||||||||||||||||||||||||||||||||
Colour | Silver,Black,Red,Blue,or as required | |||||||||||||||||||||||||||||||||
Length | As required | |||||||||||||||||||||||||||||||||
Shape | Round,Square,T-slot,or as per the drawings and samples | |||||||||||||||||||||||||||||||||
Fabrication | cutting,drilling,punching,bending,etc | |||||||||||||||||||||||||||||||||
Tolerances | As per your requirements | |||||||||||||||||||||||||||||||||
Package | inner plastic paper interleaving each piece profile,outer fixed by plywood, or as per your requirements | |||||||||||||||||||||||||||||||||
Payment terms | TT or LC at sight | |||||||||||||||||||||||||||||||||
Price terms | FOB;CIF;CNF | |||||||||||||||||||||||||||||||||
Delivery time | 15-20 days after order confirmation | |||||||||||||||||||||||||||||||||
Certification | ISO 9001:2008; | |||||||||||||||||||||||||||||||||
Application | Decorations,Fence,Building,Aviation industry,Mechancal equipment | |||||||||||||||||||||||||||||||||
Capacity | 5000 tons per month | |||||||||||||||||||||||||||||||||
Min order quantity | 1 Metric ton | |||||||||||||||||||||||||||||||||
Chemical Composition |
|
Advantages:
1.Stylish designs: per drawing,re-design as requested or market needs.
2.Features:subtle edges and elegant appearance, and easy processing and installation 3.A wide range of Application: doors, kitchen,equipment frame,industry,curtain wall,solar,decorations,transportation tools,and other so many constructions or building area.
4.Credible quality:ISO9001:2008
5.Favorable Price:FOB price:USD $ 1000-5000/Ton
6.Stable and timely supply: 3-5 weeks upon receipt of 30% advanced deposit.
product picture
factory picture
certification picture