Aluminum Pipes 7000 Series
USD $2,500 - $5,000 /Metric Ton
Min.Order:1 Metric Ton
Product Name: Aluminum Pipes 7000 SeriesKey special features:
Process of cold drawn is available.
Seamless
Diameter: outer: 9- 500 mm
Inner: 8-450mm
Thickness: 0. 5 -50 mm
Customized lengths are accepted (not more than 12000mm)
Finish: mill finish, anodized, powder coated, electrophoresis, sand blasting Etc.
Color available: silver, champagne and so on, depends on your demand
Type: square, round, rectangular
Procedure: extruding, cutting, coating, packing.
Standard: ASTM BS and EN Standard, ISO9001:2008
Products Line for Aluminum Pipes 7000 Series :
Item | Series | Products | Alloy |
Series Alloy Product | Drawn Seamless Tube | Bike Suspension Tube | 7050-T651 / T7651 |
Motorcycle Suspension Tube | 6082-T651 | ||
Baseball Bat | 7001 / 7050 / 7046 | ||
Steady Material for Optical Equipment | 5056-H32 | ||
Ski Pole, Trekking Pole | 7075-T6 | ||
Arrow Tube | 7075-T6 | ||
Carabineer | 7075-T6 | ||
Hockey Stick | 7075 / 6082-T6 | ||
Aluminium Exturusion | Large Profile | Large Aluminum Tube | 6061-T6 / 6063-T6 / 3003-32 / 3003-34 / 3003-T0 |
Extrusion Profile | Special Profile | 7075-T6 / 2024-T4
|
Alloy, Chemical Composition and Mechanical Property of K&B Metal Aluminium 7XXX Series
Alloy No. | Chemical Composition | Al Content ≥ | Temper | Tensile Strength (Mpa) | Yield Strength (Mpa) | Elongation (%) | Hard (HB) | ||||||||||
Si | Mg | Fe | Cu | Mn | Cr | Ti | Zn | Others≤ | |||||||||
| Single | Total | |||||||||||||||
7005 | <0.35 | 1.0-1.8 | <0.40 | <0.10 | 0.2-0.7 | 0.06-0.20 | 0.01-0.06 | 4.0-5.0 | Zr:0.08-0.15 | 0.05 | 0.15 | Rest | T4 T5 T6 | 390 380 430 | 255 315 355 | 17 15 11 | 101 109 108 |
7050 | <0.12 | 1.9-2.6 | <0.15 | 2.0-2.6 | <0.10 | <0.04 | <0.06 | 5.7-6.7 | Zr:0.08-0.15 | 0.05 | 0.15 | Rest | T73511 T7451 T7651 | 496 524 552 | 434 469 490 | 12 11 11 | 132 140 147 |
7075 | <0.40 | 2.1-2.9 | <0.05 | 1.2-2.0 | <0.30 | 0.18-0.28 | <0.20 | 5.1-6.1 | Ti+Zr<0.25 | 0.05 | 0.15 | Rest | T6 T73 | 570 505 | 505 435 | 11 — | 150 140 |
Payment and Shipping Terms:
Sample Lead time: 15-18working days include 7-10days making tooling if it's necessary.
Production lead time: 10-20working days.
Payment term:
1. Tooling: 100% prepaid by T/T
2. Parts: 30% upon order confirmation and balance before delivery by T/T.
3. Other payment terms can be discussed.
Shipping Term: FOB, CIF or others can be discussed.