27 Years Export Experience OEM Balance Shaft Gear For Diesel Engine
USD $1.59 - $1.69 /Piece
Min.Order:99 Pieces
Baoding Military Quality Machinery Manufacture Co., Ltd.
Tractor Spare Parts Quanchai Diesel Engines Parts Timing Gear
High Strength timing Gear, Cylindrical Gear, Engine Timing Gear
Farm Single Cylinder Diesel Engine Parts Large Gear Manufacturer
Original Quality Diesel Engine Crankshaft Timing Gear For Quanchai
Agriculture Products Single Cylinder Walking Tractor Starting Gear
Single Cylinder Diesel engine Speed Governor gear speed reducer gear
Engine Model | s193 s195 |
Weight | 0.21-1.2 kg |
Material | Steel |
Color | Silvery and black |
MOQ | 99 |
Warranty | 12 months |
Sample | One sample accept, sample fee by customer |
Standard | ISO9001:2008 |
Packaging Details: 100 pieces per carton or as required
High quality durable small steel diesel engine gear for tractors price
Delivery Detail: Shipped in 20 days after payment.
Established in 1989,our factory currently has 29 production lines and 7 plants. We are proud to be associated with major OEM for 105 countries all over the world. Now, the warehouse covers more than 11,000 square meters.
There are as many as 3,200 kinds of products. 23,000 pieces of products are produced and with an average shipments 4.5 containers each day.
We have developed to meet specific requirements with great solution within 48 hours. The delivery date of customized product is 24 days on average. We aim to become the global ONE-STOP mechanical parts supermarket.
a) How to prolong service life of bearings?
Accurate installation and using,alignment,timely monitor,re lubrication etc.
b) Reason for bearings failure?
Usually is incorrect using method,pollution,improper use of lubricant,damage happened in installation and handing,also including installation error.according to the traces can know the reason why is failure.
c) When select bearings specifications,what you need to consider?
The precision of the bearings(rotating precision,dimensional tolerances)internal clearance and preload bearing material and heat treatment.structure of cage and material.
d) Payment method,packing way,transport method,time of delivery?
T/T,PAYPAL,WESTERN UNION,L/C
Tube,box,carton,pallet,
By sea,by air
2-5days after receipt of payment.