Steel Structures steel train station building
USD $800 - $1,000 /Ton
Min.Order:25 Tons
Tianjin Qiangbang Industrial Co., Ltd.
Steel structure is a new type of building structure system, which is formed by the main steel framework linked by H-section, Z-section, and U-section steel components or any other product shape according to customer's requirements, roof and walls using a variety of panels and other components such as windows and doors
Steel structure specification | ||||||
Item Name | Steel Structures steel train station building | |||||
Material | Grade Q235, equivalent to ASTM A36. Grade Q345, equivalent to ASTM A572. | |||||
Dimension | As your requirment | |||||
Design load | Snow load:20kg/m2, Wind speed:36m/s, Earthquake: Grade 7 | |||||
Section | H-section, Z-section, and U-section steel components or any other product shape according to customer's requirements | |||||
Paint | 1. Primer paint one coat 20-30 um 2. middle paint two coat 40-60 um 3. Finish paint one coat 20-30 um | |||||
Application | Steel workshop,steel structure warehouse,garage and any other steel structure buildings | |||||
Certificate | ISO9001:2008,AWS certified welder passport,SGS,BV. | |||||
Advantage | 100% Free design,fast and easy installation & dismantle | |||||
Note:1.Customization available 2.As long as you like, we can design and provide drawings for you. 3.In order to give you a better quotation and drawings,pls tell us the ;Length,width,eave height and local weather. | ||||||
Trade terms | ||||||
Brand Name | Tianjin Qiangbang | |||||
Place of origin | Tianjin,China | |||||
Supply ability | 4000Tons per Day | |||||
Port | Xingang Port,Tianjin China | |||||
Package | According yours requirement,usually bundle with steel strip | |||||
MOQ | 100 Square meters | |||||
Grade No. Identification | English label with specifications | |||||
Trade Terms | CIF, CFR, FOB, EXW etc. | |||||
Payment | 100% Irrevocable documentary L/C at sight; or 30% deposit in advance and the balance against copy B/L within 3 days | |||||
Delivery Time | 15-20 working days |