Hongfa AAC plant office in Indonesia, 30000m3/year light block machine
USD $489,000 - $555,000 /Set
Min.Order:1 Set
Shandong Hongfa Scientific Industrial & Trading Co., Ltd.
AAC block machine description
We are the top leader in China on manufacturing the Autoclaved Aerated Concrete Line(AAC) with 65% market share. We have exported our lines to different countries -- Russia, Thailand, Ukraine, Middle East and so on.
We can supply our customer for designning, production, installation, commissioning, training and good after-sale service.
Capacity: from 50000 cubic meter to 300,000 cubic meters per year.
Equipments: stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc.,
1 Product weight is according to 600kg/m3 to control.
2 annual capacity 300,000M3.
3 set raw material proportion: cement 6.5%, raw lime 23%, flyash 68%, gypsum 3%, aluminum paste powder 350g/M3.
4 water and material rate 0.631
5 one mould product 2.88M3
6 Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7 casting slurry temperature 38-42 degree
8 body quiet stop. Time is 1.5-2.5hours, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa
9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.
10.
Cement lime fly ash style aerated block raw material proportion
name | unit | Cement lime fly ash |
flash | % | 65-70 |
cement | % | 6-15 |
lime | % | 18-25 |
gypsum | % | 3-5 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.60-0.65 |
Casting system | OC | 36-40 |
Aluminum mixing time | S | 30-40 |
11. Cement lime Sand style aerated block raw material proportion
Name | Unit | Cement Lime Sand |
Sand | % | 55-65 |
Cement | % | 10-20 |
Lime | % | 20-30 |
Gypsum | % | 2-3 |
Aluminum powder paste(600kg/m3) | 1/10000 | 8 |
Water & material rate |
| 0.65-0.75 |
Casting system | OC | 35-38 |
Aluminum mixing time | S | 30-40 |
Reference: cement is 42.5 Portland or 42.5 common cement
Aluminum power paste calculate to use according to 600kg/m3
Remark: the accurate batching rate is adjustable according to the raw material locally.