xps extruded machinery/xps foam board production line/co2 xps extrusion line
USD $500,000 - $900,000 /Set
Min.Order:1 Set
Beston (henan) Machinery Co., Ltd.
xps extruded machinery/xps foam board production line/co2 xps extrusion line
CO2 Foaming XPS Foam Board Production Line is one of our hi-tech products first successfully developed and sold in China. Depending on continuous improvement and updation, our technical level keeps leading position in China. Poly Styrene foamed board is one kind of good insulating materials with continuous even surface and beehive structure. It has superior advantages of heat preservation, heat insulation, waterproofness and high compression resistance. XPS board has been widely used in the fields of heat preservation and insulation for roof and outer wall, low temperature storage facilities, surface and undersurface of roads. As an ideal heat insulating and dampproof material, it has wide market prospect.
All components of the production line:
No. | Name | Quantity |
1.0 | Material Handling and measurement of the feeding systems | 1 set |
2.0 | Double screw kneading and extruding system |
|
2.1 | Order TDS-95 on twin screw Extruder | 1 set |
2.2 | Continuous plate screen changer | 1 set |
3.0 | Metering injection system | 3 set |
4.0 | Single screw Extruder cooling system |
|
4.1 | Order tdd-250 under single - screw Extruder | 1 set |
4.2 | motionless mixer | 1 set |
4.3 | Oil temperature controller | 9 set |
5.0 | mould | 2set |
6.0 | Molding auxiliary equipment system |
|
6.1 | Leveling machine ( including 2 oil temperature controller ) | 1 set |
6.2 | I - level multi - roller traction machine | 1 set |
6.3 | Power roller Frame | 60 meters |
6.4 | Online peeled and slot machines |
|
6.5 | Rough milling and embossing machine | 1 set |
6.6 | cut-to-length machines | 1 unit |
6.7 | The longitudinal length of slot milling machine | 1 set |
6.8 | The Lateral ulnar notch precision milling machine | 1 set |
6.9 | stacker | 1 set |
6.10 | automatic packaging unit | 1 set |
7.0 | The electrical control system of Production Line | 1 set |
8.0 | Recycling granulator ( including crusher ) | 1 set |
8.1 | Bin and forced feeding system | 1 set |
8.2 | TDD150P vented single-screw extruder | 1 set |
8.3 | the Melt screen changer | 1 set |
8.4 | Pull of pelletizing systems | 1 set |
Model | JG-XPS135/150 | JG-XPS170/200 | JG-XPS139/170 (CO2) | JG-XPS75P/200(CO2) | |||||
Extruder | Φ135/32 | Φ150/34 | Φ170/28 | Φ200/32 | Φ139/32 | Φ170/36 | Φ75/36 | Φ200/36 | |
Heating power (approx) | KW | 50 | 52 | 78 | 100 | 70 | 100 | 60 | 80 |
Driving motor power | KW | 75 | 55 | 90 | 90 | 90 | 90 | 110 | 110 |
Thickness of board | mm | 20-100 | 40-120 | 20-50 | 25-60 | ||||
Width of board | mm | 600, 900, 1200 | 600, 900, 1200 | 600 | 600 | ||||
Length of board | mm | 1200, 1250, 2450, 2500 | |||||||
Output (approx) | kg/h | 320 | 380-500 | 250-400 | 320-550 | ||||
Installed capacity (approx) | KW | 260 | 400 | 300 | 400 | ||||
Dimensions (L×W×H)(approx) | m | 40×10×4 | 50×12×4 | 45×10×4 | 50×12×4 | ||||
Total weight (approx) | T | 26 | 33 | 30 | 33 |
For waterproofing, heat preservation and heat insulation in wall and roof of residential buliding, office building, industrial workshop etc. construction industry;
For anti-freezing and heat preservation of the roadbed project such as the highway, railway, airport, etc.
For anti-freezing bulge material of concrete water delivery channel in water conservancy project; (such as divert water project from the south to north);
For heat insulation and heat preservation of the ventilation pipe of central air condition;
For using under the floor of floor heaters project,moistureproof, heat insulation and sound insulation;
For heat insulation board, cold preservation, waterproof of the refrigeration storehouse;
For heat insulation and heat preservation of steel construction workshop, iron wall house and colored ripple tile;
Payment Terms | 1) 30% by T/T as down-payment after confirmation of the Sales Contract within 5 working days; 2) The balance 70% by T/T after the inspecting of the machine in our factory and before shipment. |
Accepting & Inspecting | 1) Within the agreed time, the Buyer comes to our factory to inspect. 2) The Seller runs the machine and promises the machine in two hours’ working successful. 3) Other special request, it’s negotiated by two sides. 4) The charge should be afforded by the Buyer, if there is material testing. |
Installation & Test-running | 1) The Buyer should prepare the plant, operators and tools for machine installing, and make the energy available such as water, electricity, materials, work space, labors and so on. 2) The Seller sends one engineer for direction and supervising the installing, test-running and training. The test-running will be finished in 15 days. 3) The buyer should pay $100 per day as subsidy for the engineer, and in addition the round airplane tickets, food, hotel fee and insurance of the engineer during the installation and test-running period. |
Instruction | 1) Mechanical and electrical operation manual (1). 2) Electrical connection drawing (1). 3) Operation technique manual (1). |