China hot forging supplier steel precision hot forged part
USD $29 - $129 /Piece
Min.Order:200 Pieces
Qingdao Xinghe Machinery Co., Ltd.
2017 advanved machines OEM metal forged stainless steel astm a182 f11 alloy steel flange
China forged supplier Auto parts custom precision forged steel spline shaft forging
OEM pipe fitting precision forged steel connector pipe fittings forged fittings
OEM 316 worm shaft stainless steel forging parts shaft forging
OEM adjustable Q235 steel forged formwork clamp galvanized construction formwork clamp
1. Product Details:
Material: steel, stainless steel, carbon steel
Technology: Forging, cold forging
Surface treatment: sand blast, polishing, painting,
Machining: grinding, tapping
2. Product Pictures:
XH-1 XH-2 XH-3 XH-4
XH-5 XH-6 XH-7 XH-8
XH-9 XH-10 XH-11 XH-12
XH-13 XH-14 XH-15 XH-16
XH-17 XH-18 XH-19 XH-20
Qingdao Xinghe Machinery Co.,Ltd.
Forging :
We are Qingdao Xinghe Machinery Co.,Ltd in China. Our goal is simple: to make CROWN your first choice in OEM cast &forging parts for years to come. Providing excellent quality cast &forging parts to a high standard. Looking forward to working closely with clients to help them grow a business relationship with us.
Machining workshop:
Inspection process:
In order to ensure the quality of the orders, our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
All of our operations are strictly compliant with ISO 9001: 2008 guidelines
We own automated casting lines, CNC machining, CMM inspection, spectrometers and MT testing equipment, X-ray.
Mateiral:
Common material: Iron, ADI, Grey iron, Ductile iron, Steel, Stainless steel, Carbon steel, Aluminum, Alloy, Bronze, Brass, Copper.
Package:
1.) wooden, carton;
2.) pallet;
3.) as customers' requirement.
Please send us information for quote: drawing, material, weight, quantity and request.
Yes, we make the drawing of your sample and duplicate the sample.
Sample: 25-30 days after you start to make mold. The accurate time depends on your product.
Order time: 35-40 days after the payment. The accurate time depends on your product.
Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.
PDF, ISGS, DWG, STEP, MAX..
We can’t offer you all the information of our customer because we have duty to protect our customers’ privacy. But we can provide you some part of B/L.