Hot Well Unit
USD $1 - $100 /Unit
Min.Order:1 Unit
Chongqing Jinbo Marine Equipment Import & Export Co., Ltd.
Hot Well Unit :
This series hot well is one of the most important parts of the combination systems of fuel-oilling exhaust gas and boiler.The main use of hot well is to cooling the steam to water,which is the medium after the function of the internal cyclying of exhaust gas boiler.The water is also used for the continue cyclying of the system and at the same time it is useful to economize the fresh water and the remaining hot cyclying.During the cyclying system the medium would be inevitably pollutedby oil and other impurities.At one time,hot well is also the filter instrument of the working medium of the cyclying system.After the medium filtered through hot well cooled water.The oil and other imprities was sepowated,then drovined to the botton of the of the cabit of the ship.
Hot well unit consists of 3 parts. These 3 parts respectively are the atmosphere condedser, the condensing water receive cupboard and the save cupboard(hot well).
The steam and condensing water which come from condensing water pipe was cooled by atmosphere condedser,then the condensing water get into the condensing water receive cupboard.The cooling water come from sea pressure tank,enter the cyclying of cooling chamber and flow out from cooling water outlet.The filters of the condensing water cupboard filters out the larger particles,the floating oil is separated from the water through the specific gravity difference of oil and water,observe the water from the sight mirror,open the vavle to discharge oil when the oil reached the thickness.The cooling water inflow the save cupboard and the drainage discharge from the drain outlet.Adding fresh water to the save cupboard by automatic supply water inlet or manual operation supply water inlet.If the water temperature is too low,heating the water by high temperature steam,then pumping the water to boiler for reused after the water temperature reach the requirement.If the water level of the save cupboard is too low,the boiler feed water pump stop automatically.
1.How about the Delivery time?
Lead time since receipt of 30% T/T deposit payment: 45 days.Samples will be prepared within 5 Days.
2.What kind of payments does jenor support?
T/T, L/C ,Western Union can accept.
3.What's the MOQ?
Generally speaking, the MOQ is 1PCS.
4.Do you charge for the samples?
According to our company policy,we just charge the samples based on EXW price.and we will return the samples fee during the next order.
5.Can you produce aocording to customers' design?
Sure, we are professional maunfacturer, OEM and ODM are both welcome.
1. 100% factory tested before shipment.
2.Any Inquiries will be replied within 24 hours.
3. Supply of chemicals,filter elements,membranes and other consumable spare parts.
4. One year equipment warranty.
5.Professional manufacturer. Welcome to visit our website: http://jinbomarine.en.china.cn.
6.After Sale Service:
1).All products will have been strictly Quality Checked before pecking.
2).All products will be well packed before shipping.
7.Faster delivery:Sample order in stock ,and 3--7 days for bulk production
8.Payment:You can pay for the order via :T/T,Western Union,Paypal& MoneyGram.
9.ShippingWe have cooperation with DHL, TNT, UPS, FEDEX, EMS, China Air Post.
You also can choose your own shipping forwarder.
Song Feiya(Marketing Engineer)