Vertical posture center transmission mud scraper for sedimentation tank sewage treatment
USD $4,500 - $59,999 /Set
Min.Order:1 Set
Shandong Jinhaosanyang Environmental Protection Machine Co., Ltd.
Vertical posture center transmission mud scraper for sedimentation tank sewage treatment
Centre drive mud scraper mainly by the bridge, and driving mechanism, working center bearing, scraping the city-state scraping the arm, stabilized tube, scum on a plate etc. Scraping the arm in the driving mechanism to lead, around the pool center axis rotation, installation in blow on the arm of a group of scraping the city-state with rotating arm in scraping, in the bottom of the sludge sedimentation blowing pool center mud collecting pool, at the same time, the scum of the liquid surface in scum scraper surrounding slag dam form the diffuser area concentration, scraping by scum on the steaks to set a slag, ejecting pool outside.
Structure and features
1. Simple structure, light weight, Due to the truss structure, reduce weight than traditional institutions.
2. Simple maintenance and convenience, low operating cost.
3. New type of transmission mechanism, slow down, machine adopts cycloidal pinwheel reducer, installation is convenient, simple and compact structure, high efficiency.
4. Electrical elements adopt outdoor sex, safety and reliability and stochastic control or remote control.
5. According the user specified size manufacturing, parts in contact with water or use of stainless steel.
1. discharge hopper components 2.skimming institutions 3.scraper arm and scraper plate 4.steady flow barrel
5. center rotating vertical shaft frame 6.driving device 7. working bridge 8.scum baffle 9.weir plate
Technical parameters
1. How to buy your interested products?
ANS: You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project (More details, please contact us).
2. How to pay?
ANS: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
ANS: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
ANS: We use standard package. If you have special package requirements, we will pack as you required, but the fees will be paid by customers.
5. How to install after the equipments arriving destination?
ANS: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
6. How long is the validity?
ANS:The validity is 12 months from B/L date.