Industrial organic sewage waste water treatment plant(WWTP)
USD $6,500 - $38,000 /Set
Min.Order:1 Set
Shandong Jinhaosanyang Environmental Protection Machine Co., Ltd.
Industrial organic sewage waste water treatment plant
Equipment applicable scope
The equipment is used in residential area, hotel, nursing homes, schools, mines, factories and such life organic wastewater treatment and anything like industrial organic wastewater treatment.
Equipment process description
WSZ-A equipment design is mainly to the sewage and anything like industrial organic wastewater treatment, its main processing method is used at present the mature biochemical treatment technology contact oxidation method, water quality parameters according to the general life sewage water quality design calculation, feed BOD5 according to 200 mg/l plan, effluent BOD5 according to 20 mg/l plan. There were six composed of: (1) (2) at the beginning of the pond contact oxidation pool (3) the second pond (4) disinfection pool, disinfection device (5) sludge pond (6) the wind machine room, fan.
Equipment structure and characteristics
WSZ-A device for buried setup, maintenance and repair is very difficult, therefore in the design of the equipment will be considered its free maintenance, the whole equipment structure reasonable and reliable, also consider to even happen some fault, and also through the hole into the inspection equipment in the equipment.
WSZ-A all facilities are set in the equipment of several the cabinet, the A3 steel plate with production, the thickness of the steel plate handled 8 mm, each case with seamless steel tube connection, and the equipment inside and outside all use ministry of chemical industry to promote A product chlorosulfonated polyethylene anticorrosion coating, coating the coating equipment general 8 way: 2 coat 6 road face paint. Corrosion life generally available for 10 years.
A complete set of WSZ-A design of equipment maintenance cycle for 10 years.
Equipment craft flow
Equipment supporting pump
WSZ-A water pump is used for supporting the sewage from the adjustment in the pool up to WSZ-A in equipment, water pump used by the nanjing deep well pumps factory and Germany AS the joint production of anti-clogging tear submersible sewage pump type.
The water pump drainage capacity is strong, no congestion, can effectively through the diameter lower than 30-phi 80 mm solid particles, the water pump a tear of the organizations that can put the filament tear of substance. Need not add mesh pumps, pump for safe operation of more than 8000 hours.
Water pump is equipped with electric protection switch, float switch, automatic coupling device, WSZ-A equipment supporting A water pump adopt two, including A back-up.
Equipment selection
In selecting WSZ-A device before, must first make clear the nature of the sewage, feed water quality, water and requirements to discharge standards.
Adjust by users or build pool, generally for concrete pool body, adjust the pool of capacity shall be according to the drainage cycle, production process factors to determine, general regulation ponds capacity for 6-10 times more capacity.
In the design WSZ-A device can embed under the surface, can also be placed in above ground, also can use half buried type. The case of the pipeline between equipment by my units to provide, run before even the only good between in and out of the pipe and pipe, through cable can run.
This equipment such as used in cold areas can the equipment inspection hole heightening, buried in a belt of the following equipment, equipment can be normal operation. In southern region equipment can also be placed outdoor ground level ground, do not need to build houses.
Technique parameters:
1. How to buy your interested products?
ANS: You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project (More details, please contact us).
2. How to pay?
ANS: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
ANS: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
ANS: We use standard package. If you have special package requirements, we will pack as you required, but the fees will be paid by customers.
5. How to install after the equipments arriving destination?
ANS: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
6. How long is the validity?
ANS:The validity is 12 months from B/L date.
1. Detailed installation manual and maintenance guideline are provided with the equipment.
2. Technical training and site-commissioning are available for you.
3. Any equipment issue, we will stand by. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4. About the after-sales supervisory problems, you can call +86 536 6184876. We have professional engineer help you solve related equipment questions.