Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)
Resort hotel underground sewage waste water treatment plant(WWTP)

Resort hotel underground sewage waste water treatment plant(WWTP)

USD $5,000 - $49,990 /Set

Min.Order:1 Set

Supply Ability:
15 Set / Sets per Month
Port:
Qingdao
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
jinhaosanyang
Model Number:
DCW

Shandong Jinhaosanyang Environmental Protection Machine Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer,Trading Company
Weifang Shandong China
Main Products: Environmental Pollution Control Equipment Bar Screen Machine ,Mud Scraper ,Vacuum Filter Machine ,Belt Type Filter Press ,Sand Water Separator

Product Details

Hotel domestic and sanitary integrated waste water treatment plant(WWTP)

 

Product Description

 

Hotel domestic waste water treatment plant is an integrated plant which adopts the advanced Biological technology and the company’s scientific research and engineering practice result, it can effectively remove BOD5,COD and NH3-N. The device is characterized by the stable performance, effective treatment, economical investment, automatic operation, convenience of maintenance and small occupying space. There is no need for plant construction, neither heating and heat preservation. The surface can be used as green land or square land.

As the most efficient sewage treatment device, it is widely used in treating the sewage in the area of senior hotels, villa districts and residential districts, etc. The water after treatment would meet the national emission standards.

 Resort hotel underground sewage waste water treatment plant(WWTP)

Features

1.DCW underground sewage treatment device can be buried under the earth. The surface can be used as green land. And there is no need for plant construction, neither heating and heat preservation. FRP or A3 steel plate anticorrosion manufacture is suitable for the device with a capacity less than 5t/h.

2.The level 2 biological contact oxidation process adopts the patent aerator, it doesn’t require complicated pipe fittings. Compared with the activated sludge tank, it has a smaller size and a better adaptability to water quality and stable outlet water quality. No sludge expansion.

3.The sludge tank adopts the natural sedimentation method, one discharge for sludge is necessary for every three to eight months. (Suck the sludge with dung-cart or carry away after dewatering.)

4.Generally, specially-assigned person is unnecessary for the device, proper maintenance is needed.

With a strong adaptability to the variation of water quality.

5.It doesn't require compression container. The equipped air compressor and circulating pump reduce the investment cost a lot.

6.With lower power consumption and less maintenance. The aerobic process of this device can purify the stench of sludge.

Resort hotel underground sewage waste water treatment plant(WWTP)

Technical parameters

Resort hotel underground sewage waste water treatment plant(WWTP)

Resort hotel underground sewage waste water treatment plant(WWTP)

 

Application:

 

- Hotel, Restaurant, Sanatorium, Hospital

 

- Residence community, Village, Town

 

- Station, Airport, Wharf, Ship

 

- Factory, Mine, Army, Travel sites, Scenic spot

 

- Industrial organic wastewater 

Resort hotel underground sewage waste water treatment plant(WWTP)

Resort hotel underground sewage waste water treatment plant(WWTP)

 

Packaging & Shipping

 Resort hotel underground sewage waste water treatment plant(WWTP)Resort hotel underground sewage waste water treatment plant(WWTP)

 

 

FAQ

 

1. How to buy your interested products?

  ANS: You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project (More details, please contact us).

2. How to pay?

  ANS: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

3. What is the delivery time?

  ANS: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

4. How to pack the products?

  ANS: We use standard package. If you have special package requirements, we will pack as you required, but the fees will be paid by customers.

5. How to install after the equipments arriving destination?

  ANS: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.   

6. How long is the validity?

  ANS:The validity is 12 months from B/L date.

 

Company Information

 Resort hotel underground sewage waste water treatment plant(WWTP)Resort hotel underground sewage waste water treatment plant(WWTP)

 

 

 

 

Contact Supplier

Mr. Hao Huang General Manager Chat Now
Telephone
86-536-5838610
Mobile
15165652764
Fax
86-536-6184876
Address
No.106 Shungeng Road,Economic Development Area of Zhucheng City,China Weifang,Shandong

You May Like

New Products

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~