China Supplier Prefab Steel Structure Building Modular Building Prefabricated Houses
USD $500 - $600 /Ton
Min.Order:10 Tons
Liyang Weifeng Equipment Co., Ltd.
China Supplier Prefab Steel Structure Building Modular Building Prefabricated Houses
Liyang WeiFeng Equipment Co., Ltd is a comprehensive company, our product line covers hot steel strip, cold rolled steel strip,galvanized steel trip,induction welded steel pipe,and water atomized iron powder
Steel products are widely used in pipe,cold-rolled,furniture manufacturing,constructin,sports and other fields
Iron powder are widely applied in the industries of automobile,motorcycle,home applianced,magnetic ing machinery and agricultural machinery
steel structure building | |
Item Name: | Light cheaper prefab workshop buildings |
Material: | Grade Q235, equivalent to ASTM A36. Grade Q345, equivalent to ASTM A572. |
Section: | Any product shape according to customer's requirements |
Certification: | ISO quality system, Chinese GB50221-2001 |
Sand Blast: | Sweden SA 2.5 Sand blasting |
Welding: | Single level butt welding, fillet welding by electric arc welding, and Gas shielded welding. |
Surface treatment: | Hot dip galvanized, Standard: ISO1461(1999),JIS H 8641-1999,ASTM A 123/A 123M-02 |
Paint, 1, Primer paint, 2, middle paint, 3, finish paint. | |
Carry capacity | Resist strong wind and earthquake, bears heavy snow |
Advantage | Strong & safe ,easy to install and disassemble, good insulation |
waterproof, fireproof, low carbon, energy saving | |
Drawing | We can make the quotation according to customer's drawings. |
We can also design and quote according to customer's requirements. | |
| |
Why choose us? | |
ü Fast and qualified detail design | |
ü Workshop pre-install. | |
ü Professional on-site guidance | |
ü Ensure the product quality. | |
ü Timely service and progress | |
| |
Comparation between surface treament | |
ü Hot dip galvanize | |
1, Standard: JIS, DIN, ASTM B695-2000 | |
2, Hot dip galvanizing hole cutting good looking on surface of | |
3, Galvanizing process: Steel structural components →Degreasing →Rinsing→ Pickling →Rinsing → Fluxing → Galvanizing →Quenching → (Passivation) → Inspecting →Finished Product | |
| |
ü Paint | |
1, Primer paint one coat 20-30 um | |
2, middle paint two coat 40-60 um | |
3, Finish paint one coat 20-30 um Paint Type: 1,red primer, 2,zinc primer, 3,Alkyd primer |