Daheng automatic wall printing machine
Daheng automatic wall printing machine
Daheng automatic wall printing machine
Daheng automatic wall printing machine
Daheng automatic wall printing machine
Daheng automatic wall printing machine

Daheng automatic wall printing machine

USD $3,180 - $3,230 /Set

Min.Order:1 Set

Supply Ability:
10000 Set / Sets per Month
Port:
qingdao ningbo shanghai guangzhou all china port
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Condition:
New
Automatic Grade:
Automatic
Power(W):
1.5kw
Rendering Thickness:
30 mm
Rendering Height:
3 m
Place of Origin:
Henan, China

Henan Daheng Machinery Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: Food Machine ,Farm Machine ,Packaging Machine ,Coal and Charcoal Briquette Machine ,Plastic Recycling Machine

Product Details

Contact Details

Contact : Ms Coco

Mobile
:0086-13838536862

wechat/whatsapp/viber
:0086-13838536862

skype
: luckydh88

Product Description

Application about automatic wall printing machine


Automatic wall rendering machine is the ideal equipment for residential buildings, office buildings etc.

It can plaster on cement wall, brick and concrete wall, hollow wall , light body brick, baking free brick wall etc.

The rendering material could be lime, cement mortar , foam mortar, gypsum etc.

The rendering thickness is no more than 3 cm and the height could be up to 5m.

It could be adjust different thickness to suit each operation.

Main Features 
Plastering Height
0-5meters
Plastering Thickness
2-25mm
Plastering Width
80cm or 100cm
Capacity
560 square meters/8 hours
Dimensions
720*1000*680mm
Power supply
1.5kw
Voltage/frequency
According to your demands
Weight
240KG
Surface
smooth
Vibrator
Yes
Juncture device
Yes
Smoothing knife
Yes
storage capacity
90-100KG
Perpendicularity degree
≤2mm
Level degree:
≤2mm
Detailed Images

Feature about the wall rendering machine

the automatic rendering machine utilize the conveyor taking mortar forwardly and upwardly, the conveyor can take mortar or stop in any position by hand control. It can render to the roof by all direction.

It can make the machine installation fast and stable The hydraulic telescopic rod can make the machine installation in 10 seconds.

There are min-vibrators after the spatula, thus there is no need to worry about hollowing and adhesion.

The rendering machine can saving more than 20% raw material (cement& sand).

The capacity is as 15 professional plasterers.

Hand control switch for conveying belt

The conveyor belt can be controlled at any position by hand stop or ash supply.

Operation button

The plastering plate can change the angle of the rise of large angle walls, falling even small angle cut with light pressure, to achieve the original underground machine, the only way to wipe out the vertical wall to ensure zero error and completely wipe the top

Pedal pressure relief

The use of hydraulic telescopic rod, and the top of the top, can be in ten seconds and fix the machine

Electrical control

NBehind the plastering plate fitted with two mini vibrator, you don't have to worry about the hollowing and scratches the wall of force

Product Show


1.Automatic plastering, automatic lifting, one-time molding, adjustable thickness, no fly ash.

2.Out of the site 2 meters in height by 0.8 meters can be freely, without removing any component, which be provided with a universal wheel, flexible movement.

3.Independent research and development to ensure the delivery of mortar mortar pump, strong power, which is guaranteed to improve efficiency.

4.No scaffolding, runway and steel reinforcement, 1-2 can operate.

5.It it does not need shooting leveling, no dead angle, no cracks, no leakage of ash, door, window, corner column angle, which can adjusted freely , mortar flow speed, reach to ten times more than manual plastering .The plastering quality reached or exceeded the national standard of engineering quality, improve the quality of the project to reduce the project time.

6.It has the follow advantages : small volume, convenient to move, simple operation, high efficiency, energy saving, water saving, material saving, reduced cost, strong adhesion, no fly.

7.All electrical products equip with high sensitivity leakage protection device apply for construction which is easy to use and transport. ash, long service life etc.

Machine Working 

1, wipe the board did not change into the plastering angle before starting switch machine does not start, avoid scraping wiping plate.
2, when the motor is switched on, the machine will automatically cut off the power supply, the protection of the wire rope is not chaos, the inverted switch can be changed.
3, machine down card opportunity to automatically cut off the power supply to protect the wire rope will not be chaos.
4, the wire rope is exposed, the rough found should be replaced, if there is a broken rope, the machine with non normal speed will be stuck down 20cm.
5, all the activities of the closing and fastening wire have been anti rust treatment, all the bearings are through the multi-layer seal processing, all the accessories are from the best enterprises in the country. Strive to create the most applicable, efficient, the best quality, the world's most advanced machinery.
6, the head of the machine design is heavy, even if the hydraulic oil is not loose, it will not fall back.

Instructions

1, before use, one day ahead of the Yin wall, Yin through the best. Do not absorb water walls do not shade, such as cement wall.
2, the use of the wall before the first dot or nail. Practice 1, at the bottom of the 18cm from the ground, two meters at a point, the top 80cm a point, such an approach is that a person can operate, and the error is zero, fast. 2, from the bottom of the ground 18cm, RBI, two meters, two meters in the middle of a two person operation, one hand supporting tube attached to the central point, the other one will stay placed between the square tube and the vertical rod, this approach is less than vertical zero error, horizontal 2mm.
3, before the factory machine has been adjusted and locked, no error will not be adjusted.
4, the first machine fixed in the room to run once a time.
At the end of 5, will be posted on the square have hit the point, the machine pushed to the wall, close to the square of the chassis antenna, beam Dingsi on top of a climbing or another hand square post central point, the operator will stand placed between the pole and the pipe, can be pressed on the hydraulic. From this process, moving to a fixed 2 in just 10 seconds, 1 faster.
6, the ash bucket and wipe the mouth up, pay attention to the two vertical rods around the prohibition of filling ash, ash filling height and wall thickness according to the number of rooms and walls, generally 2.85 meters, the thickness of 2cm ash bucket enough, midway without ash.
7, if the point start switch, motor within 1 second to automatically stop, the motor reverse, the reverse switch can be replaced.
8, start button, vibration and belt opened at the same time, in the way up to manual conveyor belt adopt intermittent ash delivering way, in order to reduce the fly ash, 50cm from the top, the conveyor belt automatic stop for dust, wipe the board automatically change the angle to the automatic shutdown or automatic down vibration automatic stop, if the lack of ash machine will shutdown or advance down, if the decline in the machine, automatically cut off the power supply of mechanical ash, to protect the rope disc disorder, machine will automatically stop in the end. From A to B a work cycle as long as 2 minutes to 2.5 minutes.
Cleaning and maintenance
One, cleaning and maintenance is very important, thorough cleaning and immediate maintenance will make your machine every day like new.
Washing key: conveyor belt inside and outside, vibrator, template before and after casing, an ash bucket, hydraulic climbing wheel, casters and surface cleaning.
1, the conveyor belt in the washing position on both sides of the machine, the main drive shaft and the angle formed by the conveyor belt, with a water pipe washing.
The washing method of 2 casters. We use the distribution tube or other machines will pry it up with a water bottle, the bottle with a small part of the flushing, universal, flexible rotation to.
Sand ash 3, the vertical rod, cleaning bags under water.
4, nylon wheel on the sand, to pull off the pole, with a hydraulic hit two sleeve with high pressure washing.

Packaging 

Stock 

Our Service

Pre-sale:

1. Suggest to client suitable raw material, final product capacity.

2. Introduce machine's structure and features in detail, explain the price component.

3. answer client concerned questions.


After-sale:

1. Start production as soon as receiving down payment.

2. Send photos of machine in manufacturing and finished photos to client, for your better learn about the machine's condition.

3. Delivery machine in time, taking photos during loading, so you can "remote monitoring" your goods.

4. Documents and certificate available in time.

5. Manual documents available. Engineer can be sent to client site for installation instruction.


Packing &Delivery
Company Information

Contact Supplier

Ms. Anna Daheng General Manager Chat Now
Telephone
86-371-13838253915
Mobile
13838253915
Address
NO. 1406, Unit 2, No. 1 Building, Hengdalvzhou, the Crossing of 8th Street and 3rd Jingnan Road, Economic-technological Development Area, Zhengzhou, Henan Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Rendering Machines
Categories
Hi~