combine reaper binder harvester
USD $1 - $5,000 /Piece
Min.Order:1 Piece
Zhengzhou Wantuo Import And Export Co., Ltd.
combine reaper binder harvester
GK-140 binder to harvest the wheat rice millet and other professional alfalfa. Harvesting efficiency is high, and the loss rate is low.
Binder is fast, the harvest of up to 3 acres per hour or more. Walking speed up to 30-40KM/ hours on the road.
Cutting width 140CM. Minimum required height 70CM of the crop
The wheel is suitable for harvesting dryland, iron wheel replacement for paddy field.
Size: 3600*1950*1200mm
Power: Diesel 12hp(8.8kw)
Weight: 400kg
Adaptive crop:Wheat, rice, grass, alfalfa etc
1) used in a variety of crops, such as wheat, sorghum, sesame, alfalfa, soybeans, grass, reeds, etc.
2) automatic binder is a kind of harvest and the new binding machine, automatic cutting machine to harvest crops and bundled into a certain size.
3) a 1.4 meter cutting device in front of the tractor.
4) The wheel is suitable for harvesting dryland, iron wheel replacement for paddy field.
Delivery time: Within 5-7 days after receiving clients' payment
Payment Terms:T/T L/C Western Union D/P D/A Escow Paypal
Packing: wooden box free of fumigation for High efficiency hot wind cycle drying oven hot air drur Quality guarantee term is for one year, Malfunctions which are caused by operation mistakenly will be responsible for customers
1 Quality guarantee
2 Pre-Testing before forwarding
3 Operation Video and instruction
4 Full Technical service
1 Manufacturer for garlic breaker and sorter
2 Alibaba Assessed Gold Supplier
3 100% Quality control before forwarding
4 Competitive price withe best quality and service
1 Are you manufacturer ?
Yes we are the manufacturer and welcome to visit our factory
2 Can you change the machine voltage as our request?
Yes we can change the machine voltage as customers’ request
3 How about your after-sale service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4 Warranty time of your machine?
1 years warranty time except for consumable spare parts
5 How about delivery time of your machine?
Generally it needs 5-7 days, for big machines or producing line, it will be much longer but within our negotiated delivery time