Hydraulic heavy duty offset disc harrow
Negotiable /Set
Min.Order:1 Set
Henan Guangda Textiles Imp & Exp Co., Ltd.
Hydraulic heavy duty offset disc harrow
1BJ series harrows are suitable for crushing clods on sticky heavy clay soil land after ploughing. They can be used as instead of plough on soft and loose land. Their main features are wide space operation, narrow space transportation, convenient folded wings, reliable structure with specially-used rolling bearing, easy maintenance, high productivity.
Specification of heavy duty offset disc harrow
MODEL | 1BJ-4.4 | 1BJ-5.3 | 1BJ-6.0 |
working width(mm) | 4400 | 5300 | 6000 |
working depth(mm) | 140 | ||
Dia. Of disc(pc) | 560 | ||
Nos. of disc | 40 | 48 | 56 |
Weight(kg) | 1750 | 2200 | 2520 |
matched power | 75-100 | 100-120 | 100-120 |
productivity(ha/h) | 2.7 | 3.3 | 3.5 |
Pre-sales | Service online for 24hours to wait for your inquiry |
Sale tracking | Provide specification, photos, and delivery cost for you. Answer your questions and solve your problems at any time. |
After-sale service | 12months warranty for the machine without wearing parts. We will deliver damaged parts (except wearing parts) for free based on quality problem within warranty period. Wearing parts are also sold to match your machine if needed. |
After-sale service process | If some parts damaged, please take photos and shoot video firstly, please send us in time. We will pass your problems to our after-sale department to deal with. Solution will be provided for you as soon as possible. |
1. Delivery time: 30 days after the down payment
2. Payment term: By T/T (30% deposit in advance, 70% balance before delivery).
3. Free accessories: Easy damage parts and toolbox provided for free
4. Technical documents: Technical files, manual, documents and certificates are provided together
5. Warranty: 12 months after the goods delivery your port
6. Tractor color: As per request
7. Logo: Can stick your logos for free if needed
[Step 1] Send a inquiry by email or trademanager.
[Step 2] We proivide you the offer.
[Step 3] Confirm delivery time and freight operation.
[Step 4] Arrange production after 30% deposit received by T/T.
[Step 5] Confirm consignee and notify party information.
[Step 6] Balance payment received and book ship arranges shipping.
[Step 7] Performa invoice, packing list and copy bill of lading sent to you.
[Step 8] Product received.