Big Capacity Compressed Wood Blocks Pallet Making Machine
Negotiable /Set
Min.Order:1 Set
Wood Pallet Machine
Introduction:
1.Wood pallet making machine is used to make the block for the pallet which is used into the transportation from sawdust, wood shaving and others wood waste;
2.Middle and around is heated evenly, high strength. The end pallet block is smooth surface and waterproof, durable for use. It could soaked in water 48 hours without cracking;
3.The end pallet block's size can be made according to customer's requirement, size range from 75*75mm to 145*145mm; One machine can make two different sizes block.
The production line of the compressed wood pallet machine:
(1)Wood crusher: If the material is bigger than 5*5mm, we advice first crush into small pieces
(2)Dryer machine: If the raw material moisture is bigger than 15%, should use one dryer machine to dry them
(3)Glue mixer: Use the glue mixer to mix the material with glue
(4)Wood pallet machine: Make wood pallet block .
Main data :
Model | Power (KW) | Capacity(m3/24h) | Weight (kg) | Machine size (mm) |
MD/75*75 | 13 | 2 | 1000 | 5000*600*1300 |
MD/80*100 | 13 | 2 | 1000 | 5000*600*1300 |
MD/80*120 | 13 | 2.2 | 1050 | 5000*600*1300 |
MD/90*90 | 13 | 2 | 1000 | 5000*600*1300 |
MD/90*140 | 13.5 | 2.4 | 1100 | 5000*600*1300 |
MD/100*100 | 13 | 2.2 | 1050 | 5000*600*1300 |
MD/100*115 | 13 | 2.3 | 1080 | 5000*600*1300 |
MD/100*140 | 13.5 | 2.5 | 1120 | 5000*600*1300 |
MD/140*140 | 15 | 3 | 1350 | 5000*600*1300 |
Machine photo:
Photos of end products :
All our package are standard fumigated wooden box, we need around 5 working days to finish the machine and ready to deliver. If want extra spare parts pls notify when place order
Quality guarantee terms:
Quality guarantee is one year. Spare parts we supply at factory cost lifetime.
We will be responsible for any broken which are caused by machine-self and quality problem, other situations which are caused by wrong operation, man-made problems etc will be in buyer’s response, and we will help to solve by video asap, if big problem we will send engineer to working site within 1 week.