2016 Hot Sale Family Use Coffee Roaster
USD $500 - $600 /Set
Min.Order:1 Set
2014 Hot Sale Family Use Roasting Machine
Application:
Our HD series roasting machine is our 2014 latest roaster; it can roast peanut, chestnut, cashew, soybeans, sunflower seeds, etc.
It’s a perfect roaster to process different snacks for individuals or shops.
Feature:
1. This machine choose stainless steel, steel plate made roller, heating balance and sealed relatively, with good roasting function, it can improve the roasting 1-2%.
2. During roasting, the seeds inside the rollers no stick the pan, and also easy to let out the materials, just need to switch the Reverse button, the roasted materials can be out of the roaster and auto separation.
3. The outside of the inside rollers choose high quality asbestos as thermal insulation materials, so it’s with good insulation and efficiency heating.
4.This roaster can use natural gas, liquefied gas, or heating pipe as heating source, with auto roasting, auto out.
Main data:
Model | HD-25E | HD-25G | HD-50E | HD-50G | HD-100G |
Capacity | 25-40kg | 25-40kg | 50-70kg | 50-70kg | 100-150kg |
| Capacity different depends on raw materials | ||||
Voltage | 220v/380v | 220v | 220v/380v | 220v | 380v |
Power | 1.1kw | 1.1kw | 1.5kw | 1.5kw | 2x1.5kw |
Heating power | 5kw | Gas stove | 8kw | Gas stove | Gas stove |
Size (cm) | 90x47x103 | 90x47x103 | 125x60x130 | 125x60x130 | 150x80x160 |
Weight(kg) | 90kg | 90kg | 150kg | 150kg | 200kg |
Wooden fumigated box:
All our package are standard fumigated wooden box, we need around 3 working days to finish the machine and ready to deliver. If want extra spare parts pls notify when place order.
Quality guarantee terms:
Quality guarantee is one year. Spare parts we supply at factory cost lifetime.
We will be responsible for any broken which are caused by machine-self and quality problem, other situations which are caused by wrong operation, man-made problems etc will be in buyer’s response, and we will help to solve by video asap, if big problem we will send engineer to working site within 1 week.