wheat dehuller
USD $740 - $800 /Set
Min.Order:1 Set
Hebei Ruixue Grain Selecting Machinery Company Limited
Wheat Dehuller
Introduction of wheat dehuller :
The main function of wheat dehuller is removing the shells/husks on the surface of wheat by friction of thorn roller. By controlling the friction force through reasonable rotation speed and grain flow-in volume, to achieve best hulling results.
Feature of wheat dehuller:
1. Soft rubbed processing, very low breaking rate.
2. The wheat dehuller can be used both as a stand-alone machine and in combination with the 5XZC Series Seed Cleaner, it can be integrated according to the specific needs in an existing design.
3. Wheat dehuller has different models with different capacity from 3T/H-15T/H/.
Type | 5XTK-3 wheat dehuller | 5XTK-5 wheat dehuller | 5XTK-10 wheat dehuller | 5XTK-15 wheat dehuller |
Capacity(kg/h) | 3000 | 5000 | 10000 | 15000 |
Power(kw) | 3 | 4 | 7.5 | 11 |
Dimension(mm) | 1200×900×1500 | 1200×1000×1700 | 1300×800×1900 | 1700×1000×2000 |
Weight(kg) | 200 | 250 | 350 | 510 |
We have professional world trading team with rich world trading experience, provide full English user manual, Video using
instruction, Oversea machine assembly and On-site training.
1. Q Are you factory or trading company?
A We are professional manufacturer for seed processing machinery and also a international trading company
2. Q What is your minimum order quantity?
A 1 Set
3. Q What are your payment terms for new customers?
A T/T, L/C, Money Gram, West Union, Paypal etc
4. Q How long will it take for my products to arrive me?
A Usually by sea, 20 days to 50 days depend on which country you are in.
5. Q How can I visit your factory?
A1. From Guangzhou Baiyun International Airport to Shijiazhuang international airport (2.5hours) , then to our factory by car (1hour)
A2. From Beijing West Railway Station to Shijiazhuang Railway Station by high-speed train(1.5 hours), then to our factory by car (45minutes)
A3. From Hongkong International airport to Shijiazhuang international airport (4.5hours), then to our factory by car (1hour)