Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
USD $4,000 - $20,000 /Set
Min.Order:1 Set
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.
Portable gold machine,easy to move alluvial gold centrifugal machine,gold wash plant for sale
Metal separating equipment,gold finder machine with ce/sgs/iso
Water-saving gulch gold concentrator,sand washer complete plant for hot sale
Knelson style advantages of centrifuge machine, fine gold beneficiating equipment
Good quality gravity concentator gold centrifugal concentrator
Alluvial gold dust equipment of description.
Gold centrifugal concentrator is a kind of centrifugal concentration equipment. It can be used not only for placer gold mining, but also for hard rock mining to recover the natural gold, replacing amalgamation. It is also used to recover gold from the old tailings.
Five models are available. Application shows that the recovery can be as high as 90%, especially for the case in recovering the natural gold in lode ore with 65% of the ore having a milling size of 0. 074mm, the recovery for the natural gold is expected up to 98%, For that natural gold of 0.004mm in particle size, the recovery is 97%. The cleaning up cycle is 1~4 hours, and the upgrade ratio is up to 1,000 times. The equipment is patented in China.
Alluvial gold dust equipment main Technical data
TYPE | STLB20 | STLB30 | STLB60 | STLB80 | STLB100 |
CAPACITY (T/h) | 0.2-1 | 2-8 | 10-40 | 35-70 | 75-120 |
PARTICLE SIZE (mm) | 0-3 | 0-4 | 0-6 | 0-6 | 0-6 |
FEEDING CONCENTRATION(%) | 0-50% | 0-50% | 0-50% | 0-50% | 0-50% |
BACKWASH WATER(T/h) | 1.5-2 | 4-6 | 10-15 | 17-25 | 40-60 |
OUTPUT (KG/TIMES) | 2-3 | 10-20 | 30-40 | 60-70 | 70-80 |
POWER (kw) | 0.75 | 1.5 | 4 | 15 | 18.5 |
REVOLUTION (r) | 800 | 600 | 460 | 400 | 360 |
PRESSURE WATER (Mpa) | 0.04 | 0.12 | 0.4 | 0.4 | 0.6 |
DIMENSION (mm) | 930*700*900 | 1180*1140*1250 | 1970*1670*1750 | 2300*1800*2200 | 2500*2000*2400 |
WEIGHT (kg) | 205 | 400 | 1300 | 1500 | 2000 |
Alluvial gold dust equipment of operation.
Before starting the preparation and check:
1. According to the instructions of motor required for the preparation and check before use.
2. Check the equipment whether the anchor is stable.
3. Check the state of V-belt tension and adjust appropriately (factory test machine has made adjustments)
4. Check the equipment without interference of moving parts, manual turning checks.
5. Check the discharge port (10) is closed.
Alluvial gold dust equipment of working principle.
The materials are uniformly fed to the belt. When materials go through the permanent magnetic drum, the non-magnetic and low-magnetic particles will leave the belt surface because of the centrifugal force and gravitation. Meanwhile, strong-magnetic particles are absorbed to the belt by magnetic force and then fall into the magnetic trough when the belt leaving the magnetic pulley.
Alluvial gold dust equipment stop:
The equipment need clean up concentrates per normal work shift. Before stop, first stop feed mine, then stop the equipment, wait for equipment is stationary, unscrew the drain plug concentrate outlet , the ore concentrate into the ore tank (prepared in advance) can be. Cleaning concentrate time to 15 to 20 minutes. Then, tighten drain plug, the next cycle of operation.
Alluvial gold dust equipment abnormal shutdown:
If meet special condition, need to temporary shutdown, must first stop to feed mine, then stop backwash water, and then go down. But the downtime should not be too long, too long to prevent resolve within the set of grid sand compaction. (if required downtime long, you need to clean the concentrate first, then shutdown.) In addition, when you open again after temporary shutdown, need feed slurry first, and then give backwash water, to avoid the loss of gold particles.
Welcome to visit our factory.