Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment
Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

USD $4,000 - $20,000 /Set

Min.Order:1 Set

Supply Ability:
30000 Set / Sets per Month
Port:
Xiamen Guangzhou Shenzhen Shanghai
Payment Terms:
T/T Credit Card

Quick Details View All >

Condition:
New
Type:
Other, Alluvial gold mining equipment
Production Capacity:
10-40t/h for alluvial gold mining equipment
Place of Origin:
Jiangxi, China
Brand Name:
Hengchang alluvial gold mining equipment
Model Number:
STLB 60 equipment

Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.

Business license
Business Type: Manufacturer
Ganzhou Jiangxi China
Main Products: Ball Mill ,Shaking Table ,Spiral Classifier ,Flotation Machine ,Magnetic Separator

Product Details

    Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

Alluvial gold dust equipment of description. 

Gold centrifugal concentrator is a kind of centrifugal concentration equipment. It can be used not only for placer gold mining, but also for hard rock mining to recover the natural gold, replacing amalgamation. It is also used to recover gold from the old tailings.

 

Five models are available. Application shows that the recovery can be as high as 90%, especially for the case in recovering the natural gold in lode ore with 65% of the ore having a milling size of 0. 074mm, the recovery for the natural gold is expected up to 98%, For that natural gold of 0.004mm in particle size, the recovery is 97%. The cleaning up cycle is 1~4 hours, and the upgrade ratio is up to 1,000 times. The equipment is patented in China.

 

 Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

Alluvial gold dust equipment main Technical data

   TYPE

STLB20

STLB30

STLB60

STLB80

STLB100

CAPACITY (T/h)

0.2-1

2-8

10-40

35-70

75-120

PARTICLE SIZE (mm)

0-3

0-4

0-6

0-6

0-6

FEEDING CONCENTRATION(%)

0-50%

0-50%

0-50%

0-50%

0-50%

BACKWASH WATER(T/h)

1.5-2

4-6

10-15

17-25

40-60

OUTPUT (KG/TIMES)

2-3

10-20

30-40

60-70

70-80

POWER (kw)

0.75

1.5

4

15

18.5

REVOLUTION (r)

800

600

460

400

360

PRESSURE WATER (Mpa)

0.04

0.12

0.4

0.4

0.6

DIMENSION (mm)

930*700*900

1180*1140*1250

1970*1670*1750

2300*1800*2200

2500*2000*2400

WEIGHT (kg)

205

400

1300

1500

2000

 

 

Alluvial gold dust equipment of operation.

Before starting the preparation and check:

1. According to the instructions of motor required for the preparation and check before use.

2. Check the equipment whether the anchor is stable.

3. Check the state of V-belt tension and adjust appropriately (factory test machine has made adjustments)

4. Check the equipment without interference of moving parts, manual turning checks.

5. Check the discharge port (10) is closed.

 

Alluvial gold dust equipment of working principle.
The materials are uniformly fed to the belt. When materials go through the permanent magnetic drum, the non-magnetic and low-magnetic particles will leave the belt surface because of the centrifugal force and gravitation. Meanwhile, strong-magnetic particles are absorbed to the belt by magnetic force and then fall into the magnetic trough when the belt leaving the magnetic pulley.

 

  Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

Alluvial gold dust equipment stop:

The equipment need clean up concentrates per normal work shift. Before stop, first stop feed mine, then stop the equipment, wait for equipment is stationary, unscrew the drain plug concentrate outlet , the ore concentrate into the ore tank (prepared in advance) can be. Cleaning concentrate time to 15 to 20 minutes. Then, tighten drain plug, the next cycle of operation.

 

Alluvial gold dust equipment abnormal shutdown:

If meet special condition, need to temporary shutdown, must first stop to feed mine, then stop backwash water, and then go down. But the downtime should not be too long, too long to prevent resolve within the set of grid sand compaction. (if required downtime long, you need to clean the concentrate first, then shutdown.) In addition, when you open again after temporary shutdown, need feed slurry first, and then give backwash water, to avoid the loss of gold particles.

 

 

 

Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

 

 

 

 

Welcome to visit our factory.

Alluvial gold dust equipment,easy operation gold dust machine,gold mining process equipment

 

 



 

Contact Supplier

Ms. Bella Chen sales manager Chat Now
Telephone
86-797-5792699
Mobile
86-13767722815
Fax
86-797-5792698
Address
No. 3 Chuangye Road, Guzhang Industrial Park,Shicheng County Ganzhou,Jiangxi
Whatsapp
86 13767722815

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mineral Separator
Categories
Hi~