Gold mining equipment gold prospecting professional equipment
USD $4,000 - $20,000 /Set
Min.Order:1 Set
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.
Best centrifuge machine price,gold placer mining plant alluvial mining equipment
Gold recovery centrifugal concentrator, gold centrifuge machine hot sale in ghana gold washing plant
Gold detecting machine gold centrifugal concentrator for vein gold washing
Hengchang knelson centrifugal separators,hot sell gold washing machinery gold dust plants
Gold prospecting professional equipment of description.
Gold centrifugal concentrator is a kind of centrifugal concentration equipment. It can be used not only for placer gold mining, but also for hard rock mining to recover the natural gold, replacing amalgamation. It is also used to recover gold from the old tailings.
Five models are available. Application shows that the recovery can be as high as 90%, especially for the case in recovering the natural gold in lode ore with 65% of the ore having a milling size of 0. 074mm, the recovery for the natural gold is expected up to 98%, For that natural gold of 0.004mm in particle size, the recovery is 97%. The cleaning up cycle is 1~4 hours, and the upgrade ratio is up to 1,000 times. The equipment is patented in China.
Gold prospecting professional equipment main Technical data
TYPE | STLB20 | STLB30 | STLB60 | STLB80 | STLB100 |
CAPACITY (T/h) | 0.2-1 | 2-8 | 10-40 | 35-70 | 75-120 |
PARTICLE SIZE (mm) | 0-3 | 0-4 | 0-6 | 0-6 | 0-6 |
FEEDING CONCENTRATION(%) | 0-50% | 0-50% | 0-50% | 0-50% | 0-50% |
BACKWASH WATER(T/h) | 1.5-2 | 4-6 | 10-15 | 17-25 | 40-60 |
OUTPUT (KG/TIMES) | 2-3 | 10-20 | 30-40 | 60-70 | 70-80 |
POWER (kw) | 0.75 | 1.5 | 4 | 15 | 18.5 |
REVOLUTION (r) | 800 | 600 | 460 | 400 | 360 |
PRESSURE WATER (Mpa) | 0.04 | 0.12 | 0.4 | 0.4 | 0.6 |
DIMENSION (mm) | 930*700*900 | 1180*1140*1250 | 1970*1670*1750 | 2300*1800*2200 | 2500*2000*2400 |
WEIGHT (kg) | 205 | 400 | 1300 | 1500 | 2000 |
Gold prospecting professional equipment of operation.
Before starting the preparation and check:
1. According to the instructions of motor required for the preparation and check before use.
2. Check the equipment whether the anchor is stable.
3. Check the state of V-belt tension and adjust appropriately (factory test machine has made adjustments)
4. Check the equipment without interference of moving parts, manual turning checks.
5. Check the discharge port (10) is closed.
Gold prospecting professional equipment of working principle.
The materials are uniformly fed to the belt. When materials go through the permanent magnetic drum, the non-magnetic and low-magnetic particles will leave the belt surface because of the centrifugal force and gravitation. Meanwhile, strong-magnetic particles are absorbed to the belt by magnetic force and then fall into the magnetic trough when the belt leaving the magnetic pulley.
Gold prospecting professional equipment stop:
The equipment need clean up concentrates per normal work shift. Before stop, first stop feed mine, then stop the equipment, wait for equipment is stationary, unscrew the drain plug concentrate outlet , the ore concentrate into the ore tank (prepared in advance) can be. Cleaning concentrate time to 15 to 20 minutes. Then, tighten drain plug, the next cycle of operation.
Gold prospecting professional equipment abnormal shutdown:
If meet special condition, need to temporary shutdown, must first stop to feed mine, then stop backwash water, and then go down. But the downtime should not be too long, too long to prevent resolve within the set of grid sand compaction. (if required downtime long, you need to clean the concentrate first, then shutdown.) In addition, when you open again after temporary shutdown, need feed slurry first, and then give backwash water, to avoid the loss of gold particles.