Biogas Scrubber/ Biogas purification system/ Biogas purifier/ Biogas pretreatment system
USD $6,400 - $47,000 /Set
Min.Order:1 Set
Camda New Energy Equipment Co., Ltd.
Biogas Scrubber/ Biogas purification system/ Biogas purifier/ Biogas pretreatment system
1.Application field and Environment for Biogas Scrubber System
The skid-mounted Biogas Scrubber/ Biogas purification system/ Biogas purifier/ Biogas pretreatment system adopts the dry desulfurization system which is applicable for small industrial devices whose H2S is less than 2000ppm. The biggest skid-mounted pre-treatment system can deal with 300Nm3/h biogas and we suggest it to be used in farmland which can equipped with CHP system. In the industrial waste water biogas project, if the devices has to run long time in a day, the H2S is high and has to synchronize with the nation grid, the biogas dry desulfurization system has to be designed specifically.
The working area ambient temperature should be in the range of 0 ~ 50 °C due to the drained water from the pre-treatment. If there is any underground sewage wells, the system has to anti-freezing and anti-cracking. This system is better to be installed in a well-ventilated room.
The application domains equipped with small biogas generator set:
Pig farm with more than 3000 pigs
Cow farm with more than 500 cows
Chicken farm with more than 10000 chicken
Biogas collected from more than 200 peasant households can be used to generate electricity.
2. The Main Technique Specifications of Biogas Scrubber/Biogas purification system/Biogas purifier/Biogas pretreatment system
Biomass Treatment System Specifications | |
KDCL-50 series Biomass Pre-treatment System | |
1. Main Specificstions | |
Model | KDCL-50-WQ |
The suitable genset power | 20KW-50KW |
Dimension | 2000×1600×2160 (mm) |
Weight | 2000kg |
Gas flow | 40~80Nm3/hr |
Working pressure | 4~40KPa |
Desulfurizer amount | 2×200kg |
The changing time of desulfurizer | 1500 hours |
Parts per million after purifying | 200ppm |
The designed lifetime | 15years |
2. The Main Equipment | |
1. Name | Desulfurizing tower |
Qty | 2 unit |
Model | KDTL-250-G |
Specificstions | Φ500×1880 |
Function | Desulfurization |
2. Name | Separator |
Qty | 1unit |
Model | KDFC-200-G |
Function | 1. Gas buffter; 2. De-Dust |
3. Name | Water condenser |
Qty | 1unit |
Model | KDYS-20-G |
Function | De-water before desulfurizing tower |
4. Name | Blower |
Qty | 1unit |
Model | NSR50-50A |
Specificstions | 1.1KW |
Function | Increase pressure and steady pressure |
3. The main function of this system | |
1. Desulfurization | |
2. De-dust | |
3. De-water | |
4. Increase pressure | |
5. Stabilize pressure | |
6. Change desulfurizer without stopping genset |
3. Photos of Biogas Scrubber/Biogas purification system/Biogas purifier/Biogas pretreatment system
4. ISO and CE Certificates of Biogas Scrubber/Biogas purification system/Biogas purifier/Biogas pretreatment system
5. Some Biogas Power Plant Photos with Biogas Scrubber/Biogas purification system/Biogas purifier/Biogas pretreatment system