Turnkey biogas plant, biomass plant, biogas project, biogas power plant
USD $200,000 - $1,000,000 /Set
Min.Order:1 Set
Camda New Energy Equipment Co., Ltd.
Turnkey biogas plant, biomass plant, biogas project,
biogas power plant
TURNKEY biogas plant, biomass plant, biogas project, biogas power plant, small biogas plant front drawing view,
Main Services
A biogas technology consultant.
What is biogas and why do we need it?
What we can get from biogas?
How to produce biogas?
How to use biogas?
Main Mission
A designer of biogas plant.
We provide design service according to customer’s requirement.
Drawing books enable customer to do civil work and construction.
Detailed material list enables customer to choose and purchase the right equipments,
devices and materials easily.
We offer services of construction and installation guide,project inspection and acceptance.
How to Start a TURNKEY biogas plant,biomass plant,biogas project,biogas power plant,small biogas plant
The aim of establishing a biogas plant can vary from environmental protection and waste
reduction to renewable energy production, and can include financial and non-financial
incentives. Local farmers and farmers organizations, organic waste producers and collectors,
municipalities, energy producers and other involved actors are the usual initiators of biogas
plant. From the vital spark of a biogas project idea to the end of its life-time, the process undergoes the following steps:
1.Project idea
2.Pre feasibility study
3.Feasibility study
4.Detailed planning of the biogas plant
5.Permission procedure
6.Construction of the biogas plant
7.Operation and maintenance
8.Re-investment, renewal and replacement of components
9.Demolition or refurbishment
The process flow chart of TURNKEY biogas plant,biomass plant,biogas project,biogas power plant,small biogas plant
The main equipments of TURNKEY biogas plant,biomass plant,biogas project,biogas power plant,small biogas plant
No. | Equipment |
1 | CSTR Anaerobic digestor |
2 | Double-membrane gas holder |
3 | Mixing system,Homogeneous pool |
4 | Pump,manure |
5 | Pump,slurry |
6 | Pump,water |
7 | Pump,water cycle |
8 | Pipe systemValveInstrumentElectric equipmentAnti-corossionThermal insulation |
9 | Electric control |
10 | Biogas scrubber |
11 | Biogas generator with CHP |
12 | Biogas generator with CHP |
13 | Installation |
Some biogas equipments photos of TURNKEY biogas plant,biomass plant,biogas project,biogas power plant,small biogas plant
Integrated Enamel pressed steel biogas anaerobic digester,
1 Industrialized production, more reliable quality
2 Faster Construction speed , save the management cost.
3 Nice appearance, more convenient utilization and maintenance.
4 Substantial price and repetitive appliance.
5 Equipment , highlight the additional value
6 Easy to install and transport
Biogas Holder Bag Structure(membrane),
PVC membrane gas holder
Gas inlet/outlet
Fixing device
Membrane material,
Red-mud PVC membrane
Thickness up to 1.8mm available
High tensile strength,tear resustabce,adhesion,temp resist,ordinary flame resistance,airtightness,loading capacity and puncture resistance
Standard color is red,other colors also avaible
Skid Mounted Biogas Scrubber/H2S Scrubber/Biogas h2s Scubber/ Biogas Filter/ Biogas Sulphur Romover/ Biogas Purification System
Matrix biogas desulfurization and treating integrated system , it is for removing the H2S and impurity of the biogas;desulfurization function is to use the TH701 series high efficiency desulfurizer inner the tank, to remove the H2S.
The desulfurization and treating integrated system, with reasonable structure, low bed resistance,High desulfurization and treating degree,Convenient technology operation,High penetrable sulfur degree,good adaptability of installation position,No second pollution,Safe and easy installation, and so on.
The system use TH701 series desulfurizer, which use Iron oxide as the main active constituent, make into high efficiency
biogas treating system with other accelerator,even in environment without Oxygen and Nitrogen, it can remove the H2S else, it can remove the organic sulfur such as mercaptan, and it can remove most the Nitric oxide.
Material
Cast Iron or 304 stainless steel
Function
Remove the Sulfur,moisture,dust,NH3, Fluorine,Chlorine
Biogas Generator/ Biogas Electric Generator/ Biomass Cogeneration Unit/ Biogas CHP/ Biomass Generator
Power Range: 20KW-1000KW
Gas Engine: Cummins/MTU/Perkin Gas Engine/ MAN
Control Panel: Auto and Intelligent ComAp or UK Deep Sea
Generator: French Leroy Somer, UK Stamford/ UK Engga/ USA Marathon