AUTOMATIC BRICK MACHINE
USD $10 - $8,000 /Set
Min.Order:1 Set
Zhengzhou Dahua Mining Machinery Co., Ltd.
concrete brick making machine is a new type of wall body materials inputting the latest techniques from abroad.
concrete brick making machine is a new type of wall body materials inputting the latest techniques from abroad. The main material are the coal ash(accounting for 60%), cement, coal gangue, industrial taillings, ceramic powder and city waste, the mixturer of which can be formed into all kinds of new type wall body materials, such as hollow cement block, standard brick and so on.
Our professional engineers can provide help in installation, adjustment and repair.
The cost of one block(For reference):Electricity 0.004 (11KW × 20Hour × 0.8 per degreee)
Model Items | Dimension(mm) | Shaping number | Shaping prieod (second) | Capacity per 8 hours | Power of main motor |
QT6-15 | 390×190×190 | 6 | 15-20 | 8640-11500 | 36.8KW |
245×115×90 | 15 | 15-20 | 21600-28800 | ||
240×115×53 | 30 | 15-20 | 43200-57600 | ||
QT4-20D
| 390×190×190 | 4 | 15-20 | 5000-5760 | 10.1KW |
390×240×190 | 3 | 15-20 | 4000-4300 | ||
QTJ-20D | 240×115×90 | 9 | 15-20 | 12000-12960 | |
240×115×53 | 21 | 15-20 | 3000-30240 | ||
QM6-15 | 390×190×190 | 6 | 15-20 | 8640-11500 | 35KW |
240×115×90 | 15 | 15-20 | 21600-28800 | ||
240×115×53 | 30 | 15-20 | 43200-57600 |
Our company are famous manufacturer of mining machinery, include ball mill, Raymond mill, jaw crusher, impact crusher, hammer crusher, cone crusher, roller crusher, flotation machine, magnetic separator, classifier, drying machine, kiln and so on .Welcome to visit our factory and inspect machine!
1. Packing: container. The products should be processed to be rustproof and moisture proof before delivery. And the small spare parts will be packed in one wooden crate.
2. Time of delivery: 10 working days after the receipt of the earnest money.
3. Term of Payment: T/T 30% payment in advance as earnest money, T/T the rest 70% payment before shipment.
4. Port of Loading: any port of China.
5. Installation: send the engineer to guide to install and debug the machines,
And the buyer should prepare the materials needed.
6. Warranty: The seller guarantee quality of the machines for a period of one year from the date of trial run finish, but not to exceed twenty months from date on which machines arrive at the port of destination. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost. After one year, parts can be replaced on favorable payment basis.