High quality SMC/BMC Washing basin
USD $4000 - $6000 /Piece
Min.Order:1 Piece
1) Good steel raw material
2) Prompt reply
3) Europe quality, China price
4) Delivery on time
SMC mold/ RFP mold
We have rich experience in making SMC/BMC mould. Send me the inquiry with drawing and requirement(steel raw material, cavity no. etc) for mold, and I will reply you within 24 hours and quote for you within 2 working days.
Title:
Keywords:
1.SMC mold /BMC molding / DMC mold / GMT molding / LFT mold
2.Manufacturer for compression mold and products
1,Mold specifications
Product Name | mould |
Product material | BMC /DMC/SMC/FRP/LFT/GMT |
Core&Cavity Steel | P20 |
Steel hardness: | HRC28-32 |
Mold Standard | DME |
Cavity Number | 1 |
Shaping Mode | Compression molding |
Heating System | Electric heating or oil temperature heating |
Cycle Time | 2-4 minutes |
Tooling lead time | 60 days |
Mould life | 10,0000shots |
Quality assurance | ISO900-1 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mold designs | |
In-time communication on the technical points | |
In-time sending pictures for the mold machining progress and mold finishing schedule | |
In-time mold test and sample delivery | |
In-time mold delivery. | |
For more information please contact us. | TEL:18702512729 Email:809077259@qq.com wechat:KSH809077259 |
2,Mold Making
Material of steel
cavity and core use imported S136 stainless steel with fine polishing, high hardness to get mold's high precision and good quality.
3,Mould Processing
1.Quote | According to sample, drawing and specific requirement. |
↓ | |
2.Discussion | Mold material, cavity number, price, runner, payment, etc. |
↓ | |
3.S/C singnature | Approval for all the items |
↓ | |
4.Advance | Pay 50% by T/T |
↓ | |
5.Product design | We check the product design. If some position is not perfect, |
↓ | |
6.Mould Design | We make mould design on the basis of confirmed product design, |
↓ | |
7.Mold tooling | We start to make mold after mold design confirmed |
↓ | |
8.Mold processing | Send report to customer once each week |
↓ | |
9..Mold Testing | Send trial samples and try-out report to customer for confirmation |
↓ | |
10.Modification | According to customer’s feedback |
↓ | |
11.Balance | 50% by T/T after the customer approved the trial sample and mould quality. |
↓ | |
11.Delivery | Delivery by sea or air. The forwarder can be designated by your side. |