New furnace dryer, heating machine for furnace top selling
USD $1,200 - $2,800 /Set
Min.Order:1 Set
Xiangtan Hexinsheng New Material Co., Ltd.
electric heat treatment furnace for drying ramming mass, heating furnace / ladle
New electric heating thermostat for induction furnace/ Ladle heating
Induction heating machine for refractory ramming mass pre-heating, induction furnace heating machine
Ladle Furnace Installation Equipment Furnace Ladle Dryer for Furnace Installation
New induction heating machine, pre-heater for induction furnace or ladle
Patented Products Furnace Dryer Ladle Dryer for Foundry Induction Furnace
New furnace dryer, heating machine for furnace top selling
Furnace dryer Description
Property | Induction furnace Ovening | Electric heating Oven |
Rated Power | Above 30KW(according to the size of furnace | 20-30KW |
Heating Time | 24-48 Hours | 24-48 Hours |
Working Method | Heating by electric continously (the worker heating just according to their experience through the lining change which is cost many time and labour. | Heating by electric Intermittently(Control by the machine , when the temperature reach the setting temperature it will outage automatically, when below the setting temperature then power up,save the labour and source) |
Heating Control | The worker just heating according to their experience, couldn't control the temperature exactly, result the sintered not competely even easy crack,so the lining lifetimes is not stable | Setting temperature, then heating automatically,oven effect will be better,lifetimes will be more stable |
Furnace dryer Benefits
1.During heating up,the temperature is Uniform and stable, control the heating degree so avoid the crack as the ovening not stable.
2. When producing by 1 with 2 furnace,from the average lifetimes of furnace, put the oven machine into another furnace in advance to heating,then when the furnace stop working the other furnace could work at once, save many heating time, improve the production effective.
3.During intermittently production, could pre-heating the furnace/Ladle in advance,so avoid the situation of crack because of rasie the temperture too quickly.
4. Save electric cost of ovening, labour and materials cost, improve the lifetime of lining.Improve the production effective.
5. Especially for using acidy ramming mass : Easy to finish the sintered,as we know the acidy sintering
could be almost finished at 800c,and the New pre-heater could be 800c.Save many time for labour and production.
Packing: 1 full set load in the wooden box.
Delivery: 10-15 days according to the quantity
Application / Installation:
Related Products:
Packaging:
1) Net weight 25kg per units (plastic woven bag); 1 metric ton in
Delivery:
1) Based on terms of EXW, CIF, CFR or FOB as per your request
2) Lead Time: 10-30 days according to the order quantity
3) Flexible sea shipping from port of Changsha, Shanghai, Guangzhou,
Shenzhen, or any other Chinese Main Ports.
HXS' Location:
Service:
1) Your inquiry related to our products or prices will be replied within 24 hours.
2) Individual formula design according to clients' special refractory requests.
3) Manufacturer with large capacity, ensure the fast production cycle after
confirmed the order.
4) Our professional technicians will answer all your questions in the installation
& operation with fluent English.
5) To meet the better refractory solutions, we can arrange our technicians to
customers’ plant if needed.
6) Protection of sales area and private information for all of our customers.
Xiangtan Hexinsheng New Material Co., Ltd. specializes in manufacturing high quality monolithic refractory with the right of import & export. Our company has successfully passed ISO9001:2008 quality system certification in May 2012. With a wide range, good quality, and reasonable prices,
our products are extensively used in foundry, steel alloy melting, cement kiln other industries. “Creditability and Sincerity” is the principle of our business; our monolithic refractory products
are widely recognized and trusted by users and can meet energy-saving and cost reducing.
Certification: