Automatic Plaster Of Paris Plant
USD $200,000 - $550,000 /Unit
Min.Order:1 Unit
VINAYAK GYPSUM AND INTERIORS PRIVATE LIMITED
Structure simple and durable Because we realize fluidization, the furnace does not need moving component, and the structure of the furnace becomes simple. Not only it is easy to manufacture, but also we do not need maintenance after put into operation. Because we use low-temperature source, so the furnace does not have any risk of being burnt in any condition, also the equipment will have a long life. Compact equipment, low area coverage The boiling equipment is vertical-arranged equipment, and the dust remover on the top of the furnace, make a complete body with the furnace. So the equipment is compact and low area coverage. Low energy consumption The boiling furnace with low heat and electricity consumption. In the part of energy: Most of the heat is used to dehydration and decomposition, and the rest of small part is used to heat the air from the bottom of the furnace. The heat efficiency of the furnace is above 95%. Of course the boiling furnace uses the second heat source, and final heat efficiency is amounting to the furnace efficiency multiply the boiler efficiency. But the steam boiler and the hot oil boiler are all mature hot equipment with high heat efficiency. The steam boiler can | ||||||||||||||||||||||
Good quality and stable performance Because adopt low-temperature heat source, so the gypsum is not easy to be burnt, as long as the temperature is controlled properly, there will not have CaSO4 2H2O in the finished product, and the anhydrous gypsum is within 5%, and the rest are CaSO4 1/2H2O. In order to reach the above requirement, our company have researched and developed a whole set of boiling furnace processing technology, the main material is good-quality steel. For example, heat conductive oil pipe adopts seamless steel pipe (GB3087-82). Steel plate adopts carbon steel and low-alloy steel (GB713-86); Frame steel adopts international product .Furthermore, in the work of welding, all the workers have work certificate, after welding, the coil pipe will have a water pressure test, just in case of leakage of heat conductive oil. The product is qualified if there is no leakage under the water pressure of 1.0~1.5Mpa for 24 hours. | ||||||||||||||||||||||
Product Details:
|
Packaging Details: | In 40 FT HQ Container |