bucket chain gold dredger sale
Negotiable /Set
Min.Order:1 Set
Weifang Heng An Imp& Exp Co., Ltd.
bucket chain gold dredger
1.--Parameter
Can modify and adjust according to customers' project requirement.
No. | Principal Particulars | |||||||
1 | Model | HACSD200 | HACSD260 | HACSD300 | HACSD350 | HACSD400 | HACSD450 | HACSD500 |
2 | Max. Production Capacity(solid sand) | 100m3/h | 150m3/h | 220m3/h | 300m3/h | 400m3/h | 500m3/h | 640m3/h |
3 | Max. Discharge Distance | 900m | 1000m | 1000m | 1200m | 1300m | 1400m | 1700m |
4 | Dredge Pump Suction/discharge pipe dia.(mm) | 250/200 | 300/250 | 350/300 | 400/350 | 450/400 | 400/450 | 550/500 |
5 | Main Engine power(KW) | 176 | 294 | 330 | 470 | 735 | 735 | 882 |
6 | Cutter Power(KW) | 25 | 30 | 50 | 70 | 75 | 110 | 140 |
7 | Hydraulic Ladder winch | 30KN 100m | 40KN 100m | 40KN 100m | 60KN 110m | 80KN 110m | 100KN 120m | 100KN 120m |
8 | Hydraulic Swing winch(2sets) | 30KN 100m | 40KN 100m | 40KN 100m | 60KN 100m | 80KN 110m | 100KN 110m | 100KN 110m |
9 | Spuds | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
10 | Control system | PLC | PLC | PLC | PLC | PLC | PLC | PLC |
.
2.--Customers visit our Factory
We will show you detailes and much more things about our Group company.Many senior Engineers and professional technicians composed of the Class One Technical Department.
3.--Consult and meeting with engineers
4.--Prodution
After order,we prepare all of the materials to produce .
5.--Test before shiping and transportation to the seaport
We will test the dredger well before shipment and transport it to the seaport by truck or containers.
Our dredgers working in the work site in different places of the world ,such as Bangladesh,Southeast Asia,Africa,South America and so on.
6.--Dredger spare parts
We also supply the whole set of spare parts for dredgers.
7.Certificate:By BV
8.--Contacts :more details please don't hesitate to contact me.
All ofthe spare parts of the dredger can be available within one week!
Wish you a nice day!