high performance and low price Automatic pallet feet size-setting cutting machine
USD $3,500 - $4,100 /Piece
Min.Order:1 Piece
Zhengzhou Lankai Machinery Co., Ltd.
high performance and low price Automatic pallet feet block size-setting cutter machine
good quality two roller wood debarking machine/ tree debarking machine
high performance and low price pneumatic wood block cutting machine
high performance and low price pneumatic pallet feet block size-setting cutting machinery
Professional performance Automatic pallet feet size-setting cutting machine
1. Two head pallet block extruder machine
This is the two head pallet block extruder machine, each side have only one head.
Each head can be different size of blocks.
Technical parameter:
Mode | Power | Temperature Control way | Block density | Capacity
| Weight | Dimension |
75*75 | 12kw | PID control | 550-600kg/m³ | 2-2.5m³/24h | 1200kg | 5400*750*1680mm |
80*80 | 12kw | PID control | 550-600kg/m³ | 2-3 m³/24h | 1250 kg | 5400*750*1680mm |
80*90 | 15kw | PID control | 550-600kg/m³ | 2-3.2 m³/24h | 1300 kg | 5400*750*1680mm |
90*90 | 15kw | PID control | 550-600kg/m³ | 2-4 m³/24h | 1350 kg | 5400*750*1680mm |
100*100 | 18kw | PID control | 550-600kg/m³ | 2-4 m³/24h | 1400 kg | 5400*750*1680mm |
100*120 | 18kw | PID control | 550-600kg/m³ | 2-4 m³/24h | 1450 kg | 5400*750*1680mm |
120*120 | 18kw | PID control | 550-600kg/m³ | 2-4 m³/24h | 1500 kg | 5400*750*1680mm |
120*140 | 19kw | PID control | 550-600kg/m³ | 2-4 m³/24h | 1550 kg | 5400*750*1680mm |
140*145 | 19kw | PID control | 550-600kg/m³ | 2-5 m³/24h | 1600kg | 5400*750*1680mm |
Remark:The length of the machine do not include the cutting machine e, we can do the machine different size different shape according the client requirements. We can make the final blocks with holes or without holes , please inform us when you order the machine |
Final products picture:
2. Four head pallet block extruder machine
Equipment disposition: Generally four hot presses are a production line, must provide the dryer, the gluing machine, grinder each. (Dryer, gluing machine, grinder and so on supporting facility customer buys in addition).
Personnel disposition: Production personnel’s 4-5 person of/classes. And raw material sort (screening), drying, spreads 2-3 people, looked that machine 2 people (a person may look at two machines).
Production cycle: After confirmation order form and payment advanced payment, 40 super craftsmanship factory delivery.
Equipment investment recoupment period: 10— 12 months.
This factory is responsible for the technical training, and provides the consummation the post-sale service.
Mode | Power | Temperature Control way | Block density | Capacity
| Weight | Dimension |
75*75 | 12kw | PID control | 550-600kg/m³ | 3-3.5m³/24h | 1250kg | 4800*580*1420mm |
80*80 | 12kw | PID control | 550-600kg/m³ | 3-4 m³/24h | 100 kg | 4800*580*1420mm |
80*90 | 15kw | PID control | 550-600kg/m³ | 3-4.m³/24h | 1150 kg | 4800*580*1420mm |
90*90 | 15kw | PID control | 550-600kg/m³ | 3-4.5 m³/24h | 1200 kg | 4800*580*1420mm |
100*100 | 18kw | PID control | 550-600kg/m³ | 3-4.5m³/24h | 1300 kg | 4800*580*1420mm |
100*120 | 18kw | PID control | 550-600kg/m³ | 3-4.5 m³/24h | 1350 kg | 4800*580*1420mm |
120*120 | 18kw | PID control | 550-600kg/m³ | 3-4.5 m³/24h | 1400 kg | 4800*580*1420mm |
120*140 | 19kw | PID control | 550-600kg/m³ | 3-4.5 m³/24h | 1450 kg | 4800*580*1420mm |
140*145 | 19kw | PID control | 550-600kg/m³ | 3-5 m³/24h | 1500 kg | 4800*580*1420mm |
Remark:The length of the machine do not include the cutting machine e, we can do the machine different size different shape according the client requirements.Two head at the same side should the same size of mould, the different sides can make different size of mould , means this machine can make two sizes of mould. We can make the final blocks with holes or without holes , please inform us when you order the machine |
2. Six head pallet block extruder machine
4. Glue mixing machine
Model | 1100 |
Motor power | 7.5kw |
Body thickness | 3mm |
Bottom thickness | 6mm |
Dimension | 1500*1000*1300mm |
Rotary speed | 960r/min |
Mixing time | 2-3min/time |
Capacity | 1800kg/h |
5. Automatic pallet feet block cutting machine (One time cutting two)
Motor power | 5.5kw |
Weight | 300kg |
Dimension | 2250*890*1300mm |
Saw diameter | 355mm |
Rated hz | 50hz |
Rotary speed | 2800r/min |
Capacity | 1000piece/hour |
Features: can automatic adjust to cut different size of the blocks. |
6. Air flow drying machine
Model | BY-30 | BY-40 |
Power | 7.5kw | 7.5kw |
Steel pipe thickness | 2mm | 2mm |
Big pipe diameter | 400mm | 400mm |
Small pipe diameter | 320mm | 320mm |
Capacity | 900kg/hour | 900kg/hour |
Rotary speed | 8r/min | 8r/min |
Wind volume | 10000cubic meter/h | 10000cubic meter/h |
Air temperature in dryer | 250 degree | 250 degree |
Water remove capacity | 200kg/hour | 200kg/hour |
Air flowing speed | 8m/second | 8m/second |
Drying efficiency | 85% | 85% |
Raw material water content | 30% | 40% |
Dimension | 8600*1600*2500mm | 8600*1600*2500mm |
Machine net weight | 2500kgs | 2600kgs |
7. Screw conveyor
Motor: 2.2kw
Length: 3meters
Final products:
Installation:
1. The customer should prepare the factory well before the engineer come the install the machines.
2. The customer should pay flight tickets and visa for the engineers
3. The customer should provide hotel and food for the engineers.
4. The customer should pay everyday 100USD salary to the engineers.
5. Total install time will be 8days to 15days. Include training customers’ workers, and testing the machine well and making sure the machine can work well.
6. The customer should prepare one translator for our engineer for communication.
7. The engineer should come to install the machine immediately after the customer send the invitation letter and that should be the machine reach the customers ‘factory.
Warranty
1. Warranty time: 1 year
2. Within three years, if any spare parts broken because of the quality of the machine itself we will provide free spare parts, but as for the wrong operation of the workers, we will not be responsible for the spare parts.
3. We provide all the technical and service for our machines, include install the machine well, test the machine well, and train the workers.
Delivery time:
Within 25 days after the clients place the order to us.