New Arrival!!! Pormotion!!! LIP CARE Device lip balm applicator
USD $5 - $8.5 /Unit
Min.Order:1000 Units
Shenzhen Trendz Technology Co., Ltd.
New Arrival!!! Pormotion!!! LIP CARE Device lip balm applicator
Actually our lips are hurt by sun. dust, etc in every day. We have to take care them carefully otherwise the appearance of your lips will be affected, cause problems like as dehydration peeling, lines, color of lips dark, and sagging corners of mouth.
3D super lip Balm infuser for help improving lips problem. UV LED function to infusing lip balm deeply and enhancing the moisture effect. It makes your lip soft and elastic.
Features:
1.Automatically operate when you hold the senor and apply the massager head on the lips;
2.Use together with lip balm
3.Built-in UV LED for sterilizing the massager head.
4.Utilized by ions vibration help infusing lip balm into lips deeply, make lips soft and elastic
5.Operated by 1xAG button battery( including)
Description | Pen-size lip massager |
ON/OFF | Smart sensors |
Power Supply | DC1.5V, 2*AG13 button battery |
Vibration | 130times/s |
Packing | color box |
Size | φ100*20mm |
Unit weight | 23g |
Qty/Ctn | 50pcs |
Color | Pink/white/champagne |
UV light | sterilize 20s |
HOW TO USE:
1.Open the bottom cap, take out the battery interleaving paper. Then put on the cap.
2.Open the UV LED battery cap, take out the battery interleaving paper, then put on the cap
3.Press the UV LED switch, UV LED will sterilize 20s, Health security and more effectively
4.Apply moist and transparent lip balm on your lip,Take out product, separate main body and UV LED cap.
5.Move the massager head from the centers of lip toward the corners of the mouth for lifting, repeat it.
1. Wipe clean the massager head gently with tissue paper, then put on the cap.
2. Press the UV LED switch, sterilize again.
Packing type | Blister+Gift box |
Size of carton box | 39*32.5*25 cm |
QTY/CTN | 50pcs/ctn |
N.w./G.w. | 6.2/7kg |
OEM | Yes |
Customize box | Yes |
Customize manual | Yes |
Customize logo | Yes |
Customize color | Yes |
Minimum quantity | 3000pcs |
Lead time | 25 days |
ODM | Yes |
Industrial Design | Yes |
Electric Design | Yes |
Machine Design | Yes |
Function Sample | Yes |
Build tooling | Yes |
Minimum quantity | 10000pcs |
Finish time | 45 days |