High Stability 20m Tower Scaffolding For High Rise Building
USD $6 - $18 /Piece
Min.Order:50 Pieces
Taizhou Yahua Forging Co., Ltd.
High Stability 20m Tower Scaffolding For High Rise Building
Material | Q345 |
Size | 48.3*3.2mm |
Ringlock | Q235B steel; 8mm or 10mm thickness |
Surface Finishing | HDG |
Processing Flow | Cutting off, welding, shaping, galvanizing, packaging |
Function | *main stressed part of scaffold; |
*adding inner pipe fittings on the upper end to increase height of scaffold; |
Item Code | Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
YH-RS050 | 0.5m | 1′8″ | 3.19 | 7.01 |
YH-RS100 | 1m | 3′3″ | 5.66 | 12.45 |
YH-RS150 | 1.5m | 4′11″ | 8.07 | 17.75 |
YH-RS200 | 2m | 6′7″ | 10.45 | 23.00 |
YH-RS250 | 2.5m | 8′2″ | 12.87 | 28.32 |
YH-RS300 | 3m | 9′10″ | 15.29 | 33.64 |
YH-RS400 | 4m | 13′1″ | 20.11 | 42.24 |
Material | Q235 |
Size | 48.3*3mm |
Surface Finishing | HDG |
Processing Flow | Cutting off, welding, shaping, galvanizing, packaging |
Function | Connecting vertical poles to fix the whole scaffold, keeping it from shaking |
Item Code | Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
YH-RL065 | 0.65M | 2'2" | 3.14 | 6.91 |
YH-RL088 | 0.88M | 2'10" | 3.93 | 8.65 |
YH-RL092 | 0.92M | 3' | 4.09 | 9.01 |
YH-RL107 | 1.07M | 3'6" | 4.68 | 10.29 |
YH-RL115 | 1.15M | 3'10" | 4.95 | 10.88 |
YH-RL157 | 1.57M | 5'2" | 6.47 | 14.23 |
YH-RL183 | 1.83M | 6' | 7.4 | 16.28 |
YH-RL213 | 2.13M | 7' | 8.49 | 18.68 |
YH-RL244 | 2.44M | 8' | 9.61 | 21.15 |
YH-RL305 | 3.05M | 10' | 11.83 | 26.02 |
3. Brace (Diagonal): 48.3*2.5mm
Material | Q235 |
Size | 48.3*2.5mm |
Surface Finishing | HDG or powder coated |
Processing Flow | Cutting off, both ends flattening, slotting, assembling, galvanizing, packaging |
Function | Connecting vertical poles and ledgers to make the scaffold more stable |
Item Code | Bay Length(M) | Bay Length(inch) | Brace Length(M) | Weigth(KG) | Weigth(lbs) |
YH-RB065 | 0.65M | 2'2" | 2.07M | 7.34 | 16.16 |
YH-RB088 | 0.88M | 2'10" | 2.15M | 7.99 | 17.58 |
YH-RB092 | 0.92M | 3' | 2.17M | 8.31 | 18.27 |
YH-RB107 | 1.07M | 3'6" | 2.23M | 8.4 | 18.49 |
YH-RB115 | 1.15M | 3'10" | 2.26M | 8.53 | 18.77 |
YH-RB157 | 1.57M | 5'2" | 2.48M | 9.23 | 20.31 |
YH-RB183 | 1.83M | 6' | 2.64M | 9.72 | 21.38 |
YH-RB213 | 2.13M | 7' | 2.85M | 10.31 | 22.69 |
YH-RB244 | 2.44M | 8' | 3.07M | 11.02 | 24.24 |
YH-RB305 | 3.05M | 10' | 3.56M | 12.15 | 26.73 |
Material | Q235 |
Surface Finishing | HDG |
Processing Flow | Uncoiling, cutting, grooving, punching and folding, welding |
Function | For supporting constructors to operate at heights |
Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
1.15m | 3′10″ | 10.49 | 23.07 |
1.57m | 5′2″ | 13.54 | 29.80 |
2.13m | 7′ | 17.64 | 38.80 |
3.05m | 10′ | 24.34 | 53.56 |
Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
5.17m | 1′7″ | 70.47 | 115.03 |
6.14m | 20′2″ | 82.63 | 181.79 |
7.71m | 25′3″ | 103.76 | 228.26 |
Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
0.65m | 2′2″ | 6.61 | 14.54 |
0.88m | 2′10″ | 8.62 | 18.96 |
7, Base Collar
Length(m) | Length(inch) | Weight(kg) | Weight(lbs) |
0.24m | 9.4″ | 1.53 | 3.37 |
Port: Shanghai |
Payment Terms: L/C, T/T, Western Union, MoneyGram |
Packaging Details: Packaged in Pallet |
1, Covers an area of 21,000 square meters and has 130 staff, combining research and production. |
2, Expert in scaffolding clamps for 16 years, 60% products are sold well in Europe, America. ♦ Our partners: DSS (Direct Scaffolding Supplier); ULMA |
3, Our products include: double clamp, swivel clamp, putlog clamp, girder clamp, border clamp, sleeve clap, joint pin, rapid clamp, half clamp, ringlock clamp and screw base jack & accessories. ♦ All the products are produced under BS1139 and EN74. |
4, Raw materials are brought from SHAGANG Group Co.,Ltd. |
5, We produce 100,000 pcs per week and export 40 full container loads each month. |
ADD: East Guanzhuang Rd., Jiangyan District Taizhou City, Jiangsu, China |
Tel: 86-0523-88280018 |
Mobile: 86-13601472227 |
Skype: burrows585 |
Fax: 86-0523-88280018 |
Website: |