48.3mm Tube and fitting scaffolding Internal Joiner
USD $1.7 - $1.8 /Piece
Min.Order:500 Pieces
Taizhou Yahua Forging Co., Ltd.
48.3mm Tube and fitting scaffolding Internal Joiner
♦ Drop Forged Joint-pin:
Used in horizontal position only. For joining two lengths of tube in the horizontal position. An applied force of 2.3kN was maintained for a minimum of 60 seconds. |
Drop Forged Joint-pin | |
Model Number | YH 009 |
Material | Q235B Steel |
Weight | 1.15KG |
Size | 48.3*48.3mm |
Processing Technic | Forged |
Surface Finishing | Electrical Electrogalvanizing, HDG |
Testing Standard | EN74B, BS1139 |
Certification | ISO9001:2008, SGS, CE |
Port: Shanghai |
Payment Terms: L/C, T/T, Western Union, MoneyGram |
Packaging Details: 40pcs/bag 2000pcs/pallet; |
Application Fields: |
Scaffolding, Offshore Oil Field, Drilling Platform, Solar Stand, Nuclear Power Station, Shipyard, etc. |
1, Covers an area of 21,000 square meters and has 130 staff, combining research and production. |
2, Expert in scaffolding clamps for 16 years, 60% products are sold well in Europe, America. ♦ Our partners: DSS (Direct Scaffolding Supplier); ULMA |
3, Our products include: right angle clamp, swivel clamp, half clamp, putlog clamp, beam clamp, border clamp, sleeve clamp, joint pin, rapid clamp, ringlock scaffold system, cuplock scaffold system, and screw base jack & accessories. ♦ All the products are produced under BS1139 and EN74. |
4, Raw materials are brought from SHAGANG Group Co.,Ltd. |
5, We produce 100,000 pcs per week and export 40 full container loads each month. |
ADD: East Guanzhuang Rd., Jiangyan District Taizhou City, Jiangsu, China |
Tel: 86-0523-88280018 |
Mobile: 86-13601472227 |
Skype: burrows585 |
Fax: 86-0523-88280018 |
Website: |