Washing machine parts mold plastic injection mould tooling mold
USD $0.1 - $5 /Piece
Min.Order:100 Pieces
Jiangyin Yinhai Plastic Steel Manufacture Co., Ltd.
Washing machine parts mold plastic injection mould tooling mold
Washing machine parts mold plastic injection mould tooling mold
1. Material: PA,PP,ABS,PMMA,PC,PA6,POM,PP,RUB
2. Color : Green,white, yellow(customized)
3. Surface treatment:
Mold surface: Sand blasting, Texture, Mirror;
Product surface: Plating, Powder Coating, UV Lacquer, Screen Printing, Pad Printing, Foil Gold
4. Processing Equipments:
Injection moulding machine, Cooling tower, Feeding machine, Drying machine, Mold temperature machine, Cold water machine, Manipulator, Conveyor belt, etc.
5. Our Services: Injection Moulding and assembly, etc
6. LOGO: Customized
7. Service Project: To provide production design, production and technical service, mould development and processing, etc.
8. Testing Machine: Digital Height Gauge, caliper, Coordinate measuring machine, projection machine, roughness tester, hardness tester and so on.
9. Years of experience in manufacturing and exporting.
10. Certificate: ISO9001,ROHS.
11. OEM&ODM is available.
12. Packing: Foam, Carton, Wooden boxes, or as per the customer’s requirements
13.Delivery: 7-15 days
Packing:
Packing Box | Package: Foam, Carton, Wooden boxes, or as per the customer’s requirements |
size: as customer requirement | |
Shipping Way | Shipping Time | Advantages&Disadvantages |
DHL/UPS/FEDEX/TNT | 3-5 Days | Tracking Number Available in 2 days, fast, a little expensive |
Air Shipping | 5-8 Days | Fast, FOB Terms, customers have to clear the custom by themselves |
Sea Shipping | 15-30 Days | Cheap, slow, FOB Terms, customers have to clear the custom by themselves |
1. Help customer to design, making drawing;
2. Providing free samples + dimension inspection report + material report;
3. Checking raw material, and inform customer before mass production;
4. Informing customer production schedule weekly;
5. Arrange shipment, and Inform customer in advance 7 days before finishing the order;
6. Before shipment, send the detailed product pictures, dimension inspection report, material report to customer;
7. Welcome customer inspection and the third party inspection;
8. Expressing original document;
9. We have cooperated with Midea for many years, and get their high praise.
A: We are factory.
A: Quality is priority. QC always keep strict to quality control from the very beginning to the very end.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: we have professional engineering teams and develop new product according to customers’ requirements.
If you have another question, pls feel free to contact us as below: