usd roll forming machine for roof
USD $10,000 - $11,000 /Set
Min.Order:1 Set
Cangzhou Willing International Trading Co., Ltd.
This profile has advantage inclouding beautiful, classical appearance and grace taste. It can be widely used in village, hotel,exhibition, vocation vallage, family construction and outdoor decorate.
No. | Item | Description |
1 | Raw material Standard | 1000mm |
2 | Working Speed | 8-15m/min (not including cutting time) |
3 | Roller Stations | 13 stations |
4 | Material of Roller | 45# steel quenching process and chrome coated |
5 | Material of Main Shaft | 45 steel forged, |
6 | Material of Shaft | 70 mm forged 45#steel, quenching process |
7 | Main Motor Power | 4KW |
8 | Electrical Hydraulic Station Power | 4KW |
9 | Hydraulic Station Pressure | 12.0 Mpa |
10 | Electrical Control System | PLC Panasonic Japan |
11 | Dimension (L*W*H) | 6500mm*1250mm*1300mm |
12 | Material of Cutter | Cr12 Mov HRC 58-62 |
13 | Driving Mode | single chain 1 inch |
14 | Material Thickness | 0.25-0.8mm |
15 | Cutting accuracy | ±2mm |
16 | Power Supply | 380V, 60HZ, 3 PHASES |
A:We have professional technicians for loading
Guaranteed the goods load into container without any damage.
B:Transportation : Machines need one 40 feet container to hold
Guarantee:
A: Guaranteed against malfunctions due to manufacturing defects for 1.0 year after date of purchase. Space parts will be made free of charge,but freight cost should be paid by buyer.
B: Space parts will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Commissioning:
1 technician for 7 working days from seller to buyer’s side for the instruction of installation and commissioning as well training. An English-Chinese interpreter will be send by seller in case of the buyer asks. All the expenses of them including local transportation, food, laundry and accommodation in buyer’s country and visa,international tickets will be on the buyer side. The hotel shall be equivalent or better than the level of a Chinese 3 star hotel. The buyer shall provide each person USD 100 per day as pocket money.
Q: Are you manufacturer?
A: Yes, we are manufacturer and trading company.
Q: What kind of payment term you can do?
A: We are flexible about payment terms, please contact us for details.
Q: What info you need before you make the proposal for a roll forming machine?
A: The profile drawings, material information, your special requirements.
Q: What I should do if I just start to know roll forming machinery?
A: Contact us immediately, we provide free consultant pre-sales service.
Q: How to visit our company:
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3. Fly to Guangzhou airport: By air From Guangzhou to Beijing airport; By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Recently,our products have been exported to more than 80 countries and regions over the world and maintained good cooperative relations with customers.
We do firmly believe in technological innovation and making every detail of the product perfect is our ambition ever.