GUN DRILLING MACHINE WITH THREE AIXES
USD $40,000 - $40,000 /Set
Min.Order:1 Set
Dezhou Guanlu Precision Machinery Co., Ltd.
This machine is suitable with mould/mold industry, Water hole,ejector
retainer hole,hot-runner hole, guide post hole, sprue hole and so on.
Brief introduction of our factory
Our factory are specialized in gun drilling machine, and relative tools.
We have exported to more than 10 countries abroad, and gained good repuations
on product quality and excellent after-sale service.
Brief Technical Parameters
Adopting gun drilling method (chips removed out), work piece fixed, cutters rotary in feed.
Adopting FANUC 0i MATE or GSK
Deep hole drilling range: 3mm~30mm
Deep holes accuracy less than 0.05mm / 1000mm
Roughness: Ra3.2~Ra0.04 microns (depends on materials)
Size accuracy: IT7~IT11
Our service
Replying within 8 hours
All documents offered and doubts solved.
Manufacturing termly
One year warranty
Visiting once a year ( the first five years)
For video, please come to our Facebook and Youtube
/profile.php?id=100010518558036
/channel/UCzBLa82nBYbOrnixjiVD3lw?view_as=public
WORKING CAPACITY:
Drilling diameter range: 4mm~20mm
Drilling Max depth: 500mm
MACHINE CHARACTER:
Z axis infeed speed range 5~500mm/min (stepless), Rapid speed range 3000mm/min
X axis Traval 650mm
Y axis Travel distance 500mm
Drilling bar box Speed range: 500~6000r/min (stepless), Motor Power, 4KW (inventor motor)
Machine loading weight 500KGS
Hole length diameter range ratio ≤100.
CNC SYSTEM: GSK
COOLANT SYSTEM
coolant system pressure range, 0~8MPA (adjustable)
coolant system flow range, 0~63L/MIN (adjustable)
Filter accuracy, 20 μm
Oil chamber Volume, 800L
Workpiece Processing Procedure
1. Fix the workpiece on the working table.
2. Pneumatic system control guide suite of the guide frame.
3. Start the cooling system high pressure pump group.
4. Start the drilling bar box, drive the driller rotary.
5. Z axis infeed system drive driller infeed.
6. After drilling to the setted position, driller return, coolant stop, sealed guide suite loose.
7. X, Y axis move to the next drilling position, repeat 2 to 7.
2~7 steps are completed by CNC control