600-863-4110 starting motor for PC200-7 PC220-7
USD $100 - $1,000 /Piece
Min.Order:1 Piece
Jining Sanye Construction Machinery Co., Ltd.
We can supply PC200-8 starting motor assy 600-863-4210
Our company is the authorized agency of SHANTUI products, excavator parts. And we are a Chinese MANUFACTURE. Mainly produce undercarriage parts for excavators and bulldozers.
1) SWING circle and related parts,swing gear, swing circle, swing machinery , moter ass'y, ring, valve, carrier …
2) Engine spare parts,Cylinder Head, Cylinder Block, Turbocharger, Piston, Piston Ring, Metal, Crankshaft, Oil Pump, Fuel injection Pump, Water Pump, Alternator, Starting Motor…
3) Hydraulic spare parts, Main Valve, Main Pump, Solenoid Valve, Boom/Arm/Bucket Cylinder, Final Drive, Travel Motor, Swing Machinery, Swing Motor…
4) Operator’s Cab spare parts, Cab Ass’y, Monitor, Controller, Engine Controller, Wiring Harness, Seat, Air Conditioner, Air Compressor…
5) Work equipment,BOOM,Boom cylinder,TUBE,PIN,ARM CYLINDER,ARM,Bucket Cylinder,LINK,Bucket Link,BUSHING,BUCKET,TOOTH,ADAPTER (WELDED),CUTTER…
6) Quick-wear part,Pin, bushing,Filter(OIL FILTER,FUEL FILTER,ADDITIONAL FUEL FILTER,AIR CLEANER,CORROSION ASS’Y,HYDRAULIC ELEMENT), belt, bucket lip…
7) ELECTRICAL SYSTEM,BATTERY,alternator,light,cable, RELAY, monitor,accelerator MOTOR ASS’Y, Starting Motor, AIR CONDITIONER,controller…
8) COOLING SYSTEM, RADIATOR CORE ASS’ Y, OIL COOLER ASS’ Y, AFTER COOLER ASS’Y, CONDENSER ASS’Y, AIR COOLER ASS’ Y, Radiator…
9) Undercarriage spare parts, Track shoe, Track Link, Bolt, Track roller, Carrier Roller, Sprocket, Front Idler, Idler Cushion…
10) FUEL TANK AND RELATED PARTS,STRAINER, SENSOR, fuel tank, FUEL LINES, WATER SEPARATOR,…
WEIGHT | RECOMMENDED TRANSPORT MEANS | TRANSPORT TIME | COMMENTS |
<50kg | express- | 3-7 days | fast |
UPS/DHL/FEDEX | convenient | ||
door to door service | expensive | ||
50-150kg | by air | 3-10 days | fast; |
economic; | |||
consignee has to do customs clearance | |||
150>kg | by sea | 10-50 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance | |||
2x20' or 1x40' | by rail | 20-35 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance; | |||
only full container load accepted( MOQ:2x20' or 1x40' ) |