07448-66500

07448-66500

USD $1 - $1,000 /Piece

Min.Order:1 Piece

Supply Ability:
10000 Piece / Pieces per Month
Port:
qingdao
Payment Terms:
Credit Card

Quick Details View All >

Place of Origin:
Japan
Brand Name:
07448-66500
Model Number:
D355A-3

Jining Sanye Construction Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Jining Shandong China
Main Products: Bushing ,Hydraulic Filter ,track roller ,track link ass'y ,undercarriage

Product Details

Hydraulic pump 07448-66500 For d355a-3 Bulldozer Spare Parts

 

 

 07448-66500

 

 

705-56-36040
705-51-20240
419-64-35102 
 
705-51-20430
705-51-20440
705-51-20240
705-41-01020
705-41-01020
705-13-28530
705-56-36051
705-52-21170
705-51-22000
705-51-20070
705-14-41040
705-52-20100
705-12-37010
705-22-40110
705-52-30260
 
705-56-43020
705-51-30220
705-51-30240
419-43-27401
705-52-40150
705-52-30280
705-11-33210       
705-11-33210
14x-49-11600 
705-41-01050 
705-51-30660
705-11-38010  
705-11-40010   
07446-66104   
07448-66200   
07448-66500  
07448-66802  
705-55-43000 
705-52-30560   
705-52-30550  
705-22-40070  
705-55-33100   
705-51-30710   
714-12-11111
705-12-38011 
705-12-40040
195-49-34100
705-52-40160
705-53-31020
705-53-42000
705-53-42010
705-56-44010  
705-58-47000   
705-51-32080
705-55-14000
705-53-42000     
705-53-42010 

 

Specifications

a)Premium quality standard guaranteed

b)Competitive and reasonable price

c)Long lasting and reliable working time  

d)Standard packing or according to your specification requested

e)Having scientific structure and fine producing technics  

Jining Sanye Construction Machinery Co.,ltd is specialized in bulldozer and excavator spareparts. We have advantages on

We supply OEM Replacement pins and bushings, hydraulic pumps, and common wear parts for wheel loaders, excavators and bulldozer . We ship worldwide and customer satisfaction is our number one .

1) Undercarriage spare parts manufactory , track shoe, track link, bolt, track roller, carrier roller, sprocket, front Idler, idler cushion…

2) Swing circle and related parts,swing gear, swing circle, swing machinery , moter ass'y, ring, valve, carrier …

3) Engine spare parts,cylinder head, cylinder block, turbocharger, piston, piston ring, metal, crankshaft, oil pump, fuel injection pump, water pump, alternator, starting motor…

4) Hydraulic spare parts, main valve, main pump, solenoid valve, boom/arm/bucket cylinder, final drive, travel motor, swing machinery, swing Motor…

5) Operator’s Cab spare parts, cab ass’y, monitor, controller, engine controller, wiring harness, seat, air conditioner, air compressor…

6) Work equipment,boom,boom cylinder,arm cylinder,arm,bucket cylinder,bucket,link,tooth,adapter,cutter.

7) Quick-wear part,pin, bushing,filter, belt, bucket lip…

8) Electrical system,battery ,alternator,light,cable, relay, monitor,accelerator motor ass’y,starting motor,air conditioner,controller.

9) Cooling system, radiator core ass’y, oil cooler ass’y, after cooler ass’y, condenser ass’y, air cooler ass’y.

10) Fuel tank and related parts,strainer, sensor, fuel tank, water seperator,…

11) bulldozer parts

12) Loader parts

……

 

Warm Tips:

In order to provide exactly parts . Kindly advise us your machine brand model, part number or send parts pictures.

 

 

 

About delivery

Service commitment

<1> Warranty

Q: There are so many suppliers from China, how to identify the quality?

A: All parts that we sell enjoy 3 to 12 months warranty; if any parts breaks during warranty, just offer us the proof. We'll resend you new one!

<2>Delivery

Q: What if parts we order from you are lost during delivery?

A: We'll resend the parts!

4.Price

Q: Why your price is so high?

A: You get what you pay for.

There is no winfall profits at all in the open market. We just insist resonable profits.

We offer genuine parts and replacement parts as your request.

5.Lead time

Q: How many days it takes before you deliver the goods to us?

A: We have most easily-damaged parts in stock, for small goods, we could deliver you the goods after order confirmation and receving the payment; for large quantity, we need 1 or 2 more days to order wooden box or pallet, 2-3 days to book flight/vessel and deliver the goods to named port/airport.

6.About us

<1>We have been in construction machinery field since 1995;

<2>Golden supplier of ALIBABA for years

<3>Excellent exhibitor of many famous exhibitions all over the world, CTT2012, ANKOK 2012, EXPO 2011 et

WEIGHT

RECOMMENDED TRANSPORT MEANS

TRANSPORT TIME

COMMENTS

<50kg

express-

3-7 days

fast

UPS/DHL/FEDEX

convenient

door to door service

expensive

50-150kg

by air

3-10 days

fast;

economic;

consignee has to do customs clearance

150>kg

by sea

10-50 days

slow;

economic;

it takes some time for customs   declarance and clearance

2x20' or 1x40'

by rail

20-35 days

slow;

economic;

it takes some time for customs   declarance and clearance;

only full container load

accepted( MOQ:2x20' or 1x40' )

 

Welcome all customers to visit our website and hope to build up a long-term  cooperation relationship with you !

We are sincerely looking forward to your enquiry ! 

 

If you need the product, 

 

  pls advise your machine brand & model, 

 

 or offer the Part NO. Thank you!

 

07448-66500 

 

 

 07448-6650007448-6650007448-6650007448-66500

 

Contact Supplier

Ms. Yuxia Yue Manager Chat Now
Telephone
86-537-2076706
Mobile
15053760300
Fax
86-537-2076707
Address
No.33 Jianshe Road Jining Shandong China Jining,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Engineering & Construction Machinery > Construction Machinery Parts
Categories
Hi~